Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo
Topics
  • News
  • Contracts & Tenders
  • Authorities & Government
  • Automation
  • Business & Finance
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Business & Finance›MMT Finishes NordLink Submarine Cable Survey Between Norway and Germany
Business & Finance

August 25, 2011 · about 15 years ago

MMT Finishes NordLink Submarine Cable Survey Between Norway and Germany

In spring of this year MMT was awarded the marine route survey contract for the NordLink Submarine Cable. Since the mid nineties several power cable connections between Norway and Germany have been on the drawing board. The landfall areas in Norway have all been in the Lista and Fedafjorden area, wh

2 minutes read
  • LinkedIn
  • X
  • Email

In spring of this year MMT was awarded the marine route survey contract for the NordLink Submarine Cable.

Since the mid nineties several power cable connections between Norway and Germany have been on the drawing board. The landfall areas in Norway have all been in the Lista and Fedafjorden area, while several landing points between Norderney and the north of Hamburg, Germany have been evaluated. Statnett SF ordered a route survey from MMT that partly followed routes already surveyed in order to get a complete and updated picture of the seabed conditions.

The planned NordLink submarine cable connection is a power transmission link between Norway and Germany.

The first step in this project was for MMT to perform a detailed Multibeam, sidescan sonar and sub-bottom profiler survey of a 50 m – 600 m wide route corridor. The total length is approx. 514 km. The aim of this survey was to provide a 50 x 50 cm (to 50 m water depth) or 100 x 100 cm (in deeper waters) Digital Terrain Model (DTM), side scan images and sub bottom profiles simultaneously.

MMT also preformed a geotechnical investigation of seabed sampling by use of a gravity corer and a vibro corer.

Based on the detailed survey data collected, a task plan for an ROV site inspection was developed by MMT and Statnett representatives onboard for inspecting areas of interest. The aim of this inspection was to provide more details of the seabed conditions and to identify shipwrecks, debris, corals, pipelines, cables and other seabed features with potential impacts on routing or cable installation operations.

MMT used the vessels Franklin, IceBeam and Seabeam for this assignment and is very pleased with the collaborative effort with Statnett SF.

[mappress] Source: MMT, August 25, 2011;

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Business & FinanceEquipmentOperations & MaintenanceResearch & Development

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Related articles

FPSO Cidade de Itajaí; Source: Altera Infrastructure
Business & Finance

Karoon boosts Brazilian field’s oil output with all wells now online

14 days ago

Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

14 days ago

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

FPSO Cidade de Itajaí; Source: Altera Infrastructure
Business & Finance

Karoon boosts Brazilian field’s oil output with all wells now online

14 days ago
Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

14 days ago