Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo
Topics
  • News
  • Contracts & Tenders
  • Authorities & Government
  • Automation
  • Business & Finance
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Business & Finance›China: COSL’s Deepwater Engineering Survey Vessel Completes its Trial Voyage
Business & Finance

August 26, 2011 · about 15 years ago

China: COSL’s Deepwater Engineering Survey Vessel Completes its Trial Voyage

Recently, China Oilfield Services Ltd. announced that HYSY708, a deepwater engineering survey vessel under construction has completed a 15-day trial voyage and returned successfully. This remarks the construction of HYSY708 has entered into a final stage. HYSY708, being an important member of COSL’s

1 minutes read
  • LinkedIn
  • X
  • Email

Recently, China Oilfield Services Ltd. announced that HYSY708, a deepwater engineering survey vessel under construction has completed a 15-day trial voyage and returned successfully. This remarks the construction of HYSY708 has entered into a final stage.

HYSY708, being an important member of COSL’s deepwater equipment portfolio, is capable of operating in depths of up to 3000 meters with a drilling capability at 600 meters below sea level and a maximum crane lift capability of 150 tonnes. The trial voyage has been meticulously organized by the product supervision and construction teams with support from China Classification Society (CCS), Det Norske Veritas (DNV), Shanghai Ship Research & Design Institute and its equipment providers.

During the trial voyage, a series of major offshore tests were done, namely electricity-powered propulsion system tests, communication and navigation equipment, dynamic positioning system FMEA measurement, the stability and inertia of route examination, swing and speed measurements, energy consumption and vibration and noise analysis, laying a solid foundation for the completion of HYSY 708’s construction.

[mappress] Source: COSL, August 26, 2011;

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Business & FinanceOperations & Maintenance

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Related articles

Deepsea Nordkapp rig; Source: Odfjell Drilling
Business & Finance

Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year

15 days ago

FPSO Cidade de Itajaí; Source: Altera Infrastructure
Business & Finance

Karoon boosts Brazilian field’s oil output with all wells now online

15 days ago

Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

15 days ago

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Deepsea Nordkapp rig; Source: Odfjell Drilling
Business & Finance

Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year

15 days ago
FPSO Cidade de Itajaí; Source: Altera Infrastructure
Business & Finance

Karoon boosts Brazilian field’s oil output with all wells now online

15 days ago
Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

15 days ago