Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo
Topics
  • News
  • Contracts & Tenders
  • Authorities & Government
  • Automation
  • Business & Finance
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Business & Finance›UK: GE Oil & Gas to Provide Subsea Production Equipment for Development of Causeway Field
Business & Finance

September 7, 2011 · about 15 years ago

UK: GE Oil & Gas to Provide Subsea Production Equipment for Development of Causeway Field

Reinforcing its position as a leading supplier of subsea technology for North Sea oilfield projects, GE Oil & Gas announced at Offshore Europe 2011 that it will provide subsea production equipment to Valiant Causeway Ltd. for the development of the Causeway Field. GE will supply two subsea productio

2 minutes read
  • LinkedIn
  • X
  • Email

Reinforcing its position as a leading supplier of subsea technology for North Sea oilfield projects, GE Oil & Gas announced at Offshore Europe 2011 that it will provide subsea production equipment to Valiant Causeway Ltd. for the development of the Causeway Field.

GE will supply two subsea production trees, one subsea water injection tree system, rental tooling and installation services for the project, located in the northern sector of the North Sea. The equipment will be manufactured at GE Oil & Gas facilities in Aberdeen, Scotland.

“ We are committed to commence production in the second half of 2012, and installation of the subsea tree system is planned to begin in May of 2012,” said Bryan Atchison, project manager of Valiant Causeway. “This is a very aggressive schedule and a close working relationship has been established between GE and Valiant to ensure that we are able to meet all of the project requirements.”

The Causeway Field is being developed using subsea production technology with a tie-back to the existing North Cormorant Platform. The reservoir development strategy is to maintain production with the use of electrical submersible pumps (ESPs) and water injection. The Causeway Field will comprise one oil-producing well, one contingent oil-producing well and one water-injection well.

“ This contract demonstrates GE’s strong position and ability to provide reliable technology that is designed to facilitate the installation process,” said Matt Corbin, regional leader—United Kingdom and continental Europe for GE Oil & Gas. “Our subsea tree systems are based on extensive field experience and feature well-proven interfaces with the power cables and dual ESPs to be installed in the wells.”

GE Oil & Gas offers a full range of integrated subsea solutions, including trees, controls, manifolds, connection systems, subsea power and processing. All of these systems are designed to provide competitive lead times, benchmark reliability and lowest installed cost. With 20 years of operating experience in harsh environments, GE’s subsea tree systems are an established industry benchmark.

Valiant Causeway is part of Valiant Petroleum plc, an exploration and production company with a primary focus on the U.K. and Norwegian continental shelves.

[mappress] Source: GE, September 07, 2011; Image: Antrim Energy

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Business & FinanceOperations & MaintenanceProject & Tenders

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Related articles

FPSO Cidade de Itajaí; Source: Altera Infrastructure
Business & Finance

Karoon boosts Brazilian field’s oil output with all wells now online

15 days ago

Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

15 days ago

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

FPSO Cidade de Itajaí; Source: Altera Infrastructure
Business & Finance

Karoon boosts Brazilian field’s oil output with all wells now online

15 days ago
Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

15 days ago