Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Offshore Wind›REpower Invests in German Production Sites for Wind Turbines
Offshore Wind

September 13, 2011 · about 15 years ago

REpower Invests in German Production Sites for Wind Turbines

REpower Systems SE is realigning its German production sites for wind turbines. Today, Tuesday, 13 September, the company is holding the topping-out ceremony for the expansion of nacelle and hub production in Bremerhaven. Starting in 2012/13 financial year, it will be possible there to assemble wind

2 minutes read
  • LinkedIn
  • X
  • Email

REpower Systems SE is realigning its German production sites for wind turbines. Today, Tuesday, 13 September, the company is holding the topping-out ceremony for the expansion of nacelle and hub production in Bremerhaven.

Starting in 2012/13 financial year, it will be possible there to assemble wind turbines each year with an output of 900 megawatts (MW). Up to now, the annual production capacity was 600 MW.

At the same time, the assembly hall at the Trampe/Eberswalde (Brandenburg) location is being converted to enable production of REpower’s 3.XM three-megawatt series in four assembly areas in future. The company is investing a total of some EUR 10 million in expanding the two production locations.

“ REpower leads the way for multi-megawatt offshore turbines and our 3.XM series, which was launched in 2008, is also in great demand on the market”, commented Gregor Gnädig, Chief Operating Officer (COO) of REpower Systems SE. “We have to re-position our three German plants and expand capacities in good time. The European offshore business will also increase significantly over the next few years”.

At present, REpower only assembles MM-type turbines with 2-megawatt nominal power at Trampe. To convert to the new platform, the electrical test facilities in particular have to be adapted. “The capacities for producing the international ‘REpower bestseller’, the MM series, are to be relocated to Husum and the locations in Portugal and Padubidri”, explained Gnädig.

The first 3.XM nacelles and hubs will be produced in Trampe by the end of the year.

[mappress] Source: REpower , September 13, 2011;

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Offshore WindBusiness & FinanceOperations & Maintenance

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Petrobras locks in 20-year US supply from Sempra’s LNG project in Lone Star State
  2. 2Hanwha Ocean’s design solution allowing LNG carrier’s switch to ammonia gets ABS’ thumbs-up
  3. 3Exmar’s FLNG conversion earns Bureau Veritas’ seal of approval
  4. 4Denmark opens EU’s first full-scale CO2 storage site

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free