Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo
Topics
  • News
  • Contracts & Tenders
  • Authorities & Government
  • Automation
  • Business & Finance
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Business & Finance›Denmark: DONG Energy Removes Seabed Stones from Anholt Offshore Wind Farm Site
Business & Finance

October 5, 2011 · about 15 years ago

Denmark: DONG Energy Removes Seabed Stones from Anholt Offshore Wind Farm Site

DONG Energy’s detailed seabed investigations have documented that there are about 5,000 stones at positions, which may cause problems for the wind turbine and cable installation. The stones will be removed and placed in a number of artificial reefs within the 88km2 large wind farm area. Stone fishin

1 minutes read
  • LinkedIn
  • X
  • Email

DONG Energy’s detailed seabed investigations have documented that there are about 5,000 stones at positions, which may cause problems for the wind turbine and cable installation. The stones will be removed and placed in a number of artificial reefs within the 88km2 large wind farm area.

Stone fishing and construction of the artificial reefs commenced in August, and at present, approximately 5-600 stones have been removed, and three artificial reefs have been constructed.

Stones from 0.5 to 30 tonnes

The stones weigh from 0.5 to 30 tonnes; however, the stone fishing vessels cannot carry stones weighing more than 15-20 tonnes.

The few critical stones, which the vessels cannot handle and which are placed where there should be absolutely no obstructions in relation to the construction of the wind farm, will be blasted away.

At present, two vessels are relocating the stones; at the end of October, yet another stone fishing vessel will be sent to the site. The process of relocating the stones will continue as long as the weather allows, and should the work be stopped by adverse weather conditions, it will be resumed in spring 2012.

The vessels locate the stones by means of their advanced positioning equipment based on data prepared by DONG Energy. The expected measure and weight of the stones, which are based on theoretical data analyses, have agreed with the actual finds.

[mappress] Source: DONG Energy, October 05 , 2011

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Business & FinanceEquipmentOperations & Maintenance

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Related articles

FPSO Cidade de Itajaí; Source: Altera Infrastructure
Business & Finance

Karoon boosts Brazilian field’s oil output with all wells now online

16 days ago

Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

16 days ago

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

FPSO Cidade de Itajaí; Source: Altera Infrastructure
Business & Finance

Karoon boosts Brazilian field’s oil output with all wells now online

16 days ago
Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

16 days ago