Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo
Topics
  • News
  • Contracts & Tenders
  • Authorities & Government
  • Automation
  • Business & Finance
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Business & Finance›Switzerland: ABB Wins Order to Provide Maintenance Services for DolWin2 in North Sea
Business & Finance

October 18, 2011 · about 15 years ago

Switzerland: ABB Wins Order to Provide Maintenance Services for DolWin2 in North Sea

ABB, the leading power and automation technology group, has won an order from the Dutch-German transmission system operator, TenneT to provide maintenance services for the DolWin2 link bringing power from offshore wind farms, located in the North Sea, to the mainland German grid. This contract follo

2 minutes read
  • LinkedIn
  • X
  • Email

ABB, the leading power and automation technology group, has won an order from the Dutch-German transmission system operator, TenneT to provide maintenance services for the DolWin2 link bringing power from offshore wind farms, located in the North Sea, to the mainland German grid.

This contract follows ABB’s success earlier this year when it won an order worth around $1 billion to supply the power link itself, which was the biggest power transmission order in ABB’s history. DolWin2 will deploy the world’s largest offshore HVDC (high-voltage direct current) system with a rating of over 900 megawatts (MW), keeping electrical losses to less than 1 percent per converter station. The completed link will be capable of supplying more than 1.5 million households with clean wind-generated electricity.

“ Service and maintenance are key elements in the efficient and reliable operation of these advanced offshore renewable energy transmission links and we are pleased to support TenneT with our technical expertise and competence in this area ,” said Peter Leupp , head of ABB’s Power Systems division. “ This also reinforces our growing focus on service as a key business driver .”

As part of the maintenance contract, ABB will keep up the land- and sea-based HVDC converter stations connecting the wind farms via an offshore platform to the grid. The three-year contract for an undisclosed sum has extension options. The order was booked in the third quarter.

DolWin2 will have onshore and offshore HVDC converter stations and 135 kilometers of underwater and underground DC cables. With a rated voltage of 320 kilovolts (kV), the link will have the highest voltage level of extruded cable ever used for HVDC transmission. Scheduled to be operational in 2015, DolWin2 links the 400 MW Gode Wind II wind farm and other offshore wind farms to the grid. It will avoid more than three million tons of carbon dioxide emissions per year in support of Germany’s ambitious renewable energy plans to replace its fossil-fuel-based generation.

DolWin2 is the third offshore wind connection order for ABB in Germany, following the 800 MW DolWin1 link awarded last year and the earlier BorWin1 project. ABB was previously entrusted by TenneT to provide maintenance services for the BorWin1 and DolWin1 offshore wind farm transmission connections.

ABB (www.abb.com) is a leader in power and automation technologies that enable utility and industry customers to improve performance while lowering environmental impact. The ABB Group of companies operates in around 100 countries and employs about 130,000 people.

[mappress]

Source: ABB, October 18 , 2011

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Business & FinanceEquipmentProject & Tenders

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Related articles

FPSO Cidade de Itajaí; Source: Altera Infrastructure
Business & Finance

Karoon boosts Brazilian field’s oil output with all wells now online

16 days ago

Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

16 days ago

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

FPSO Cidade de Itajaí; Source: Altera Infrastructure
Business & Finance

Karoon boosts Brazilian field’s oil output with all wells now online

16 days ago
Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

16 days ago