Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo
Topics
  • News
  • Contracts & Tenders
  • Authorities & Government
  • Automation
  • Business & Finance
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Equipment›USA: MTNW Completes USACE St. Louis District Dust Pan Dredge Mooring Monitoring Project
Equipment

November 8, 2011 · about 14 years ago

USA: MTNW Completes USACE St. Louis District Dust Pan Dredge Mooring Monitoring Project

Measurement Technology NW (MTNW) announces successful implementation of its running line tensiometer technology with the US Army Corp of Engineers Dredge Potter. MTNW collaborated with C&J Offshore and Ockerman Consulting to ensure the mooring line monitoring project was successful from the initial

2 minutes read
  • LinkedIn
  • X
  • Email

Measurement Technology NW (MTNW) announces successful implementation of its running line tensiometer technology with the US Army Corp of Engineers Dredge Potter. MTNW collaborated with C&J Offshore and Ockerman Consulting to ensure the mooring line monitoring project was successful from the initial design to the final installation and commissioning.

The US Army Corp of Engineers Dredge Potter is based near St. Louis and is charged with keeping the Mississippi passable. The Potter is a 240’ diesel electric vessel with a draft of 7’6”. It was recently retrofit during a deckhouse rebuild with a new haul winch and head hoist control system in 2011. The USACE contracted with Jensen Maritime Consultants (a Crowley company) and Ockerman Consulting to design the control system. C&J Offshore systems from Anacortes, WA were contracted to manufacture consoles and install these new controls. Ockerman Consulting chose MTNW’s Line Control Instrument RL-20175K 3-sheave running line tensiometers (RLTs) to monitor 2 mooring/hauling winches with 1.125” wire rope with a peak tension requirement of 84,000lbs.

“ The MTNW line riders installed quickly and easily. The RLTs are obviously built for a rugged environment and will have many years of service, ” said John Ockerman, Owner, Ockerman Consulting . “ The displays are intuitive and easy to work with. If you look at the whole bridge control console, from analog sweep meters to the standard PC HMI, the MTNW LCI-90i bright display jumps out at you from across the bridge .” The RLTs are integrated with the Dredge Automation Systems and Shipboard Integrated Control & Monitoring Systems. This system’s architecture provides real time and historic data to the ship’s engineers and dredge production performance data remotely to USACE headquarters.

“MTNW RLTs are being used more frequently for mooring monitoring because our design provides a smaller footprint and rapidly deployable solution for retrofitting existing winches, ” said Tom Rezanka, Managing Director of MTNW . “ We can deploy on virtually any winch, with an installation time measured in hours, not weeks or months. In every environment, our customers are interested in monitoring and data-logging possible points of failure; and the mooring lines are a critical part of any dredge operations .”

Rezanka explains, “ This is MTNW’s first installation on a dust pan dredge on the Mississippi. Our RLTs are frequently used to monitor pipe lay barges for offshore oil & gas installations around the world. We are pleased to be supporting the USACE here in the USA. ”

[mappress]

Source: prweb, November 8, 2011; Image: mtnw-usa

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

EquipmentTechnology

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Related articles

Illustration; Source: Halliburton
Automation

Eni, Halliburton cheer Asia-Pacific’s first integrated closed-loop rig automation milestone

13 days ago

Kongsberg Maritime to acquire Sweden’s Berg Propulsion
Business & Finance

Kongsberg Maritime to acquire Sweden’s Berg Propulsion

15 days ago

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Illustration; Source: Halliburton
Automation

Eni, Halliburton cheer Asia-Pacific’s first integrated closed-loop rig automation milestone

13 days ago
Kongsberg Maritime to acquire Sweden’s Berg Propulsion
Business & Finance

Kongsberg Maritime to acquire Sweden’s Berg Propulsion

15 days ago