Airborne has been awarded a contract by Saipem SA for the engineering, fabrication & delivery of a 2500 meter downline for the Guara & Lula project. The 3 inch ID downline will be used at around 2200 meter water depth for the Pre-Commissioning of the Guara & Lula-NE Gasline Project.
By winning this contract Airborne will deliver the first composite pipe meant for the deepest application worldwide. This contract is awarded due to the following unique benefits of the pipe system:
[mappress] Source: Airborne, November 9, 2011