Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Clean Fuel›Russia: Gazprom Starts Construction on Large UGS Facility
Clean Fuel

November 11, 2011 · about 15 years ago

Russia: Gazprom Starts Construction on Large UGS Facility

Yesterday Gazprom has commenced the Bednodemyanovskoye underground gas storage (UGS) facility construction. Bednodemyanovskoye will become one of the largest UGS facilities in Russia and one of the basic gas storages smoothening seasonal fluctuations in gas supply (also during abnormally cold snaps)

1 minutes read
  • LinkedIn
  • X
  • Email

Yesterday Gazprom has commenced the Bednodemyanovskoye underground gas storage (UGS) facility construction.

Bednodemyanovskoye will become one of the largest UGS facilities in Russia and one of the basic gas storages smoothening seasonal fluctuations in gas supply (also during abnormally cold snaps) in the central part of the country. Besides, the UGS facility will provide for export gas supplies through the Nord Stream gas pipeline.

The Bednodemyanovskoye UGS facility is being created in aquifers at the border between the Penza Oblast and the Republic of Mordovia. A 30 MW gas compressor unit (GCU), a gas treatment unit and gas collection stations will be built, 127 production wells will be drilled and brought onstream as part of the facility construction operations.

The UGS facility will be put into operation in a phased manner. By the 2015–2016 withdrawal season, when the facility is scheduled to become operational, its working gas capacity is to stand at 2 billion cubic meters, a GCU and 41 production wells are to be put into service.

By autumn/winter 2019–2020 the UGS facility is expected to operate at its full capacity: working gas – 5 billion cubic meters, maximum daily deliverability in the beginning of the withdrawal season – 70 million cubic meters, average daily deliverability from December through February – 43 million cubic meters.

[mappress]

Source: Gazprom, November 11, 2011

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Clean FuelNews

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Petrobras locks in 20-year US supply from Sempra’s LNG project in Lone Star State
  2. 2Hanwha Ocean’s design solution allowing LNG carrier’s switch to ammonia gets ABS’ thumbs-up
  3. 3Exmar’s FLNG conversion earns Bureau Veritas’ seal of approval
  4. 4Denmark opens EU’s first full-scale CO2 storage site

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free