Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo
Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Shipbuilding›US Navy Holds Keel Laying Ceremony for First Zumwalt Class Destroyer
Shipbuilding

November 18, 2011 · about 15 years ago

US Navy Holds Keel Laying Ceremony for First Zumwalt Class Destroyer

The U.S. Navy laid the keel for its first Zumwalt class destroyer (DDG 1000), Nov. 17, at General Dynamics-Bath Iron Works shipyard in Bath, Maine. While keel laying was once traditionally the formal recognition of the start of the ship’s construction, today’s advanced modular shipbuilding allows fa

2 minutes read
  • LinkedIn
  • X
  • Email

The U.S. Navy laid the keel for its first Zumwalt class destroyer (DDG 1000), Nov. 17, at General Dynamics-Bath Iron Works shipyard in Bath, Maine. While keel laying was once traditionally the formal recognition of the start of the ship’s construction, today’s advanced modular shipbuilding allows fabrication of the ship to begin months before.

However, the keel laying continues to symbolically recognize the joining of the ship’s components and the ceremonial beginning of the ship.

“ Keel laying is just the first of many important milestones and events in bringing Zumwalt to life ,” said Capt. Jim Downey, DDG 1000 program manager, Program Executive Office, Ships . “ With the outstanding team we have assembled, I look forward to building on the superb progress we’ve achieved to date and delivering this extremely capable warship to the Fleet. ”

The lead ship and class are named in honor of former Chief of Naval Operations Adm. Elmo R. “Bud” Zumwalt Jr., who served as chief of naval operations from 1970-1974. The ship’s co-sponsors, Ann Zumwalt and Mouzetta Zumwalt-Weathers, and Lt.Col. James G. Zumwalt, symbolically authenticated the keel with a plate displaying the initials of all four children of the ship’s namesake, including eldest son, the late-Elmo R. Zumwalt III.

Construction began on DDG 1000 in February 2009, and the Navy and its industry partners have worked to mature the ship’s design and ready their industrial facilities to build this advanced surface combatant. Zumwalt is currently more than 60 percent complete and scheduled to deliver in fiscal year 2014. Construction on the second ship of the class, Michael Moonsoor (DDG 1001), began March 2010.

Designed for sustained operations in the littorals and land attack, the multi-mission DDG 1000 will provide independent forward presence and deterrence, support special operations forces, and operate as an integral part of joint and combined expeditionary forces. This warship integrates numerous critical technologies, systems, and principles into a complete warfighting system. These include employment of optimal manning through human systems integration, improved quality of life, low operations and support costs, multi-spectral signature reduction, balanced warfighting design, survivability, and adaptability.

[mappress] World Maritime News Staff, November 18, 2011; Image: GDBIW

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

ShipbuildingBusiness & Finance

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Norwegian PSV to continue current charter for additional 100 days
  2. 2Italy’s NextGeo to open office in Germany
  3. 3TotalEnergies finds more oil off Angola, enters two exploration blocks
  4. 4Odfjell Drilling’s new rig busy until 2031 thanks to deal with Vår Energi

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free