The Ejnan liquefied natural gas carrier, with a capacity of 145,000 cubic metres, is due to arrive in the Zeebrugge LNG terminal December 22, according to the Port of Zeebrugge website.
The Zeebrugge LNG terminal is situated on a 30ha site in the outer port of Zeebrugge, Belgium.
It is operated by Fluxys LNG and has an annual throughput capacity of nine billion cubic meters (bcm) of natural gas.
[mappress]
LNG World News Staff, December 14, 2011; Image: Port of Zeebrugge