Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Clean Fuel›Australia: Yokogawa Nabs Contract for Arrow LNG Project
Clean Fuel

December 16, 2011 · about 14 years ago

Australia: Yokogawa Nabs Contract for Arrow LNG Project

Yokogawa Electric Corporation announced that its subsidiary Yokogawa Engineering Asia Pte. Ltd. has been awarded a contract by CJV, a joint venture comprised of Chiyoda Corporation as JV leader, CB&I, and Saipem S.p.A., to perform the front end engineering design (FEED) for an integrated control and

2 minutes read
  • LinkedIn
  • X
  • Email

Yokogawa Electric Corporation announced that its subsidiary Yokogawa Engineering Asia Pte. Ltd. has been awarded a contract by CJV, a joint venture comprised of Chiyoda Corporation as JV leader, CB&I, and Saipem S.p.A., to perform the front end engineering design (FEED) for an integrated control and safety system that is to be provided to Arrow Energy for the Arrow LNG Project.

For this project, Yokogawa Engineering Asia has been selected as the main automation contractor by Arrow Energy.

Arrow Energy, a 50/50 joint venture between Shell and CNPC (PetroChina), is planning the development of a liquefied natural gas (LNG) facility on Curtis Island, which is directly off the coast from the city of Gladstone in South East Queensland, Australia. The project includes the construction of a liquefaction facility, jetties, and offloading facilities. The LNG plant will receive coal bed methane (CBM) from the Surat and Bowen Basins and will process, treat, and liquefy the gas for export. In phase 1 of this project, two 4 million ton per year LNG trains will be constructed. A decision will be made at some later date whether to proceed with the planned construction of two additional trains of equivalent size.

The FEED work commenced in November 2011. Following completion of this preliminary phase and a decision to go ahead with the project, Yokogawa will proceed to supply its CENTUM VP integrated production control system and the ProSafe-RS safety instrumented system as the MAC. In this role, it will work directly with the project’s engineering, procurement, and construction (EPC) contractors.

[mappress]

LNG World News Staff, December 16, 2011; Image: Arrow

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Clean FuelProject & Tenders

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1TotalEnergies, Staatsolie and APA advancing $12.2B oil project ahead of 2027 drilling ops
  2. 2New gas discovery springs up from India’s frontier deepwater basin
  3. 3Legal showdown underway as Cotemar moves to freeze almost $60M in American Bureau of Shipping subsidiary’s assets
  4. 4Jan De Nul orders another newbuild trenching support vessel

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free