Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Clean Fuel›Australia: Arrow Submits Draft Environmental Impact Statements for LNG Project
Clean Fuel

December 19, 2011 · about 14 years ago

Australia: Arrow Submits Draft Environmental Impact Statements for LNG Project

Arrow Energy’s multibillion dollar coal seam gas (CSG) – liquefied natural gas (LNG) project has taken a major step forward following last Friday’s lodging of three draft Environmental Impact Statements with the Queensland Government. These draft Environmental Impact Statements (EIS) assess the pote

2 minutes read
  • LinkedIn
  • X
  • Email

Arrow Energy’s multibillion dollar coal seam gas (CSG) – liquefied natural gas (LNG) project has taken a major step forward following last Friday’s lodging of three draft Environmental Impact Statements with the Queensland Government.

These draft Environmental Impact Statements (EIS) assess the potential environmental, social and economic impacts and benefits of three key components within the Arrow LNG project:

– LNG Plant – planned for Curtis Island off Gladstone in central Queensland

– Surat Gas Project – upstream development near Dalby, in southern Queensland’s Surat Basin

– Arrow Bowen Pipeline – to transport CSG from Arrow’s gas fields in central Queensland’s Bowen Basin to Curtis Island

According to Arrow Chief Executive Officer, Andrew Faulkner, these draft EIS submissions represent a significant milestone for the Arrow LNG project.

“ They follow successful awarding in recent months of the front-end engineering design (FEED) contract for our LNG Plant together with contracts for Power Supply and Upstream Concept Select in both the Bowen and Surat Basins ,” he said.

To prepare the draft Environmental Impact Statements, Arrow engaged specialist environmental consultants. Each EIS was finalised in accordance with the requirements of the final terms of reference for each project issued by the Queensland Government and were supported by a range of scientific and specialist impact studies.

Once the Queensland Government determines that the draft Environmental Impact Statements meet the final terms of reference, they will be released for review by the community. Arrow will hold several rounds of community information sessions early next year to outline the reports’ findings and the organisation’s strategies for maximising project benefits and mitigating impacts.

During the review period submissions may be made, in writing, on the Environmental Impact Statements to the Queensland Government.

Mr Faulkner said an EIS for the Arrow Surat Pipeline had already been approved. “ The EIS for a pipeline to transport CSG 600 kilometres from our gas fields near Dalby in the Surat Basin to our LNG Plant on Curtis Island was approved in 2009 and in 2010 the Queensland Government granted us a licence and environmental authority for this pipeline ,” he said.

In addition, since 2004, Arrow has operated a major domestic gas business. The company currently provides up to 20 per cent of Queensland’s annual gas needs from around 1000 CSG wells in the Bowen and Surat Basins. Most of this CSG is used to generate electricity, providing enough power for up to 400,000 households each year.

[mappress]

LNG World News Staff, December 19, 2011

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Clean FuelNews

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1TotalEnergies, Staatsolie and APA advancing $12.2B oil project ahead of 2027 drilling ops
  2. 2New gas discovery springs up from India’s frontier deepwater basin
  3. 3Legal showdown underway as Cotemar moves to freeze almost $60M in American Bureau of Shipping subsidiary’s assets
  4. 4Jan De Nul orders another newbuild trenching support vessel

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free