Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo
Topics
  • News
  • Contracts & Tenders
  • Authorities & Government
  • Automation
  • Business & Finance
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Business & Finance›Denmark: DONG Energy Installs 14 Foundations at Anholt Offshore Wind Farm
Business & Finance

February 7, 2012 · about 14 years ago

Denmark: DONG Energy Installs 14 Foundations at Anholt Offshore Wind Farm

DONG Energy recently announced that 14 monopiles have been installed at Anholt Offshore Wind Farm. Since the first monopile was installed at 19.00hrs on New Year’s Eve, periods of good weather have been used to install foundations. On 1 February 2012, Svanen had erected 14 monopiles. Even though the

2 minutes read
  • LinkedIn
  • X
  • Email

DONG Energy recently announced that 14 monopiles have been installed at Anholt Offshore Wind Farm.

Since the first monopile was installed at 19.00hrs on New Year’s Eve, periods of good weather have been used to install foundations. On 1 February 2012, Svanen had erected 14 monopiles.

Even though the January weather has been rough, it has been good for foundation installation. Since 27 December, the area has been hit by two storms so strong that statistically they only occur once a year and by two storms of a category just below the first two. Due to the storms, Svanen has had to postpone departure and head for port in Grenaa twice and most recently, it has gone to the north side of Djursland off Bønnerup to find shelter against the wind. But during January, we have also had long periods of quiet weather, which is necessary to be able to install the monopiles.

When the monopiles are floated from Aalborg, it requires 12 consecutive hours during which the wave height does not exceed 1.5 metres. Pile driving also requires a period of 12 hours, but this time with a maximum wave height of 1 metre. And even though we have had storms, the weather has also been good for long periods of time with wave heights below 1 metre.

At the same time, the stone fishers have used the weather to continue moving rocks from positions that collide with the installation activities. Approx 80% of the 5,000 rocks have now been moved and used to build a number of artificial reefs inside the wind farm area.

[mappress] Subsea World News Staff , February 07, 2012; Image: DONG Energy

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Business & FinanceOperations & Maintenance

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Related articles

FPSO Cidade de Itajaí; Source: Altera Infrastructure
Business & Finance

Karoon boosts Brazilian field’s oil output with all wells now online

19 days ago

Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

19 days ago

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

FPSO Cidade de Itajaí; Source: Altera Infrastructure
Business & Finance

Karoon boosts Brazilian field’s oil output with all wells now online

19 days ago
Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

19 days ago