Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Offshore Wind›Dillinger Hütte Supplies Heavy Plate for Wind Farm Off England Coast
Offshore Wind

February 29, 2012 · about 14 years ago

Dillinger Hütte Supplies Heavy Plate for Wind Farm Off England Coast

Heavy plate from Dillinger Hütte used in construction of the world’s highest capacity wind farm off the coast of England. Walney, now the world’s largest offshore wind farm, opened off England’s western coast on 9 Feb. 2012. Dillinger Hütte supplied a total of about 36,000 tons of heavy plate in thi

1 minutes read
  • LinkedIn
  • X
  • Email

Heavy plate from Dillinger Hütte used in construction of the world’s highest capacity wind farm off the coast of England.

Walney, now the world’s largest offshore wind farm, opened off England’s western coast on 9 Feb. 2012. Dillinger Hütte supplied a total of about 36,000 tons of heavy plate in thicknesses ranging from 30 to 105 mm for the 102 wind turbines, which each feature a capacity of 3.6 MW. The wind farm was constructed about 15 km west of the English city of Barrow-in-Furness in Cumbria and covers an area of approximately 73 km².

The turbines are built on a foundation of monopiles – piling pipes that are each 56 meters in length, weigh approximately 600 tons and have a diameter of approximately 5.50 meters. These pipes are driven about 30 meters deep into the sea floor.

With the energy produced, up to 320,000 households can be supplied with electricity from wind. The wind farm therefore contributes significantly to achieving Britain’s ambitious climate goals, according to the operator, and represents a major step forward for Great Britain when it comes to reducing CO² emissions. The Walney wind farm surpasses what had been England’s highest capacity wind farm to date, Thanet, for which Dillinger Hütte likewise delivered about 46,000 tons of plate for the monopiles.

[mappress] Offshore WIND Staff, February 29, 2012

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Offshore WindNews

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Ventura Offshore rig staying longer with Eni and Petronas’ Searah in Southeast Asia
  2. 2Last FSRU in seven-vessel conversion program boosts Karpowership’s LNG-to-power value chain
  3. 3SLB’s grand slam with Aramco puts over 450 oil & gas wells on its plate
  4. 4Chevron and Egypt discuss next steps to speed up Mediterranean gas project

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free