Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Clean Fuel›Wartsila Wins Gas Power Plant Order in Indonesia
Clean Fuel

March 8, 2012 · about 14 years ago

Wartsila Wins Gas Power Plant Order in Indonesia

Wärtsilä, a leading global supplier of flexible and efficient power plant solutions, said it has been awarded the contract to supply a new, gas-fuelled power plant to Indonesia. When operational, it will serve the regional electricity grid, and will be the first ever gas-fired combustion engine base

2 minutes read
  • LinkedIn
  • X
  • Email

Wärtsilä, a leading global supplier of flexible and efficient power plant solutions, said it has been awarded the contract to supply a new, gas-fuelled power plant to Indonesia.

When operational, it will serve the regional electricity grid, and will be the first ever gas-fired combustion engine based peaking power plant in Indonesia. The plant is to be located in Sei Gelam Jambi in Sumatra.

PT Perusahaan Listrik Negara (PT. PLN), the state-owned utility company, will utilize the new facility primarily to supply power during the evening peak load hours. It will be powered by eleven 20-cylinder Wärtsilä 34SG generator sets in V-configuration, operating on compressed natural gas and providing an output of 110 MW. Wärtsilä will also supply the necessary auxiliary equipment as well as building materials. Everything is being delivered on a fast-track basis, as the plant is scheduled to be built and fully operational before the end of 2012.

“ Wärtsilä has been selected as the preferred supplier by PT PP (Persero) Tbk, the Engineering, Procurement and Construction main contractor to PT. PLN, based on the company’s proven capability to deliver high quality, and extremely efficient power plant solutions, on a fast-track basis ,” says Mr Taufiq Aria, Head of EPC Division, PT PP (Persero) Tbk.

“ Our ability to meet the tightest of delivery deadlines was, of course, a key consideration in the award of this contract. However, the Wärtsilä power plant solution itself, with its fast start-up and loading capability, its multi-unit configuration that ensures high availability, and its overall reliability and performance, was the main deciding factor ,” says Sushil Purohit, Regional Director, Wärtsilä Power Plants in South East Asia & Australia .

[mappress]

LNG World News Staff, March 8, 2012

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Clean FuelNews

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Ventura Offshore rig staying longer with Eni and Petronas’ Searah in Southeast Asia
  2. 2Last FSRU in seven-vessel conversion program boosts Karpowership’s LNG-to-power value chain
  3. 3SLB’s grand slam with Aramco puts over 450 oil & gas wells on its plate
  4. 4Chevron and Egypt discuss next steps to speed up Mediterranean gas project

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free