Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Clean Fuel›Petrobras Opens Third Unit at Bolivia Gas Plant
Clean Fuel

March 9, 2012 · about 14 years ago

Petrobras Opens Third Unit at Bolivia Gas Plant

With an investment of US$ 115 million, Petrobras Bolivia (35%, the operator of the San Antonio Block), in partnership with YPFB Andina (50%) and Total (15%), inaugurated the third natural gas processing unit at the Sábalo Gas Plant. This undertaking materializes the commitments made for the second p

1 minutes read
  • LinkedIn
  • X
  • Email

With an investment of US$ 115 million, Petrobras Bolivia (35%, the operator of the San Antonio Block), in partnership with YPFB Andina (50%) and Total (15%), inaugurated the third natural gas processing unit at the Sábalo Gas Plant.

This undertaking materializes the commitments made for the second phase of the Development Plan approved for the Sábalo field, which includes the drilling of three wells (SBL-7, SBL-8 and SBL-9), the first of which went on stream last December. The other two are expected to start producing in 2012 and 2014, respectively.

The Plan, which had a total cost of approximately US$ 300 million to be implemented, also called for the revamp of the existing trains I and II. Since January 2011, the project allowed gas production to be increased by 15%, equivalent to more than 2 million cubic meters per day (MMm³/d).

Together with the two existing trains, the Third Train at the Sábalo Gas Plant eliminates contaminants and separates and stabilizes the gas before it is delivered to YPFB which, in turn, supplies the product to both the domestic and foreign markets. The processing capacity is 6.7 MMm³/d. With the plant coming on stream, production at the San Antonio Block rose to 17 MMm³/d in January 2012. As of next June, when well SBL-8 is scheduled for completion, the production volume will reach 19 MMm³/d.

[mappress]

LNG World News Staff, March 9, 2012

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Clean FuelNews

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Ventura Offshore rig staying longer with Eni and Petronas’ Searah in Southeast Asia
  2. 2Last FSRU in seven-vessel conversion program boosts Karpowership’s LNG-to-power value chain
  3. 3SLB’s grand slam with Aramco puts over 450 oil & gas wells on its plate
  4. 4Chevron and Egypt discuss next steps to speed up Mediterranean gas project

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free