Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo
Topics
  • News
  • Contracts & Tenders
  • Authorities & Government
  • Automation
  • Business & Finance
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Storage›UK: NNDC Approves Dudgeon Wind Farm Cable Corridor
Storage

March 12, 2012 · about 14 years ago

UK: NNDC Approves Dudgeon Wind Farm Cable Corridor

North Norfolk District Council has approved a cable corridor that would connect the Dudgeon wind farm to the national grid, reported BBC. In January, Warwick Energy’s cable corridor proposal to lay 45km onshore cable running between the landfall point at Weybourne Hope (North Norfolk District) and L

1 minutes read
  • LinkedIn
  • X
  • Email

North Norfolk District Council has approved a cable corridor that would connect the Dudgeon wind farm to the national grid, reported BBC.

In January, Warwick Energy’s cable corridor proposal to lay 45km onshore cable running between the landfall point at Weybourne Hope (North Norfolk District) and Little Dunham (Breckland District) was rejected by the council.

After the company had appealed, the NNDC decided to change their decision mainly because they find the underground cable a better solution than having overhead pylons.

Even though Development Committee stated in its report that cables will have a minimum impact, the opposers say that they are going to be left with a permanent scar.

The Dudgeon wind farm will be located approximately 32km offshore of the north Norfolk coast, with the town of Cromer being the closest settlement on land. Depending on the size of wind turbine generators installed offshore, the Dudgeon project could have a total installed capacity of up to 560MW.

[mappress]

Offshore WIND staff, March 12, 2012; Image: warwickenergy

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Storage

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Related articles

Dorian LPG takes over newbuild dual-fuel LPG and ammonia gas carrier
Business & Finance

Norwegian CO2 transport and storage project gathers three industry majors

about 2 months ago

EnergyPathways launches offshore wind-linked compressed air energy storage project
Infrastructure

EnergyPathways launches offshore wind-linked compressed air energy storage project

about 3 months ago

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Dorian LPG takes over newbuild dual-fuel LPG and ammonia gas carrier
Business & Finance

Norwegian CO2 transport and storage project gathers three industry majors

about 2 months ago
EnergyPathways launches offshore wind-linked compressed air energy storage project
Infrastructure

EnergyPathways launches offshore wind-linked compressed air energy storage project

about 3 months ago