Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo
Topics
  • News
  • Contracts & Tenders
  • Authorities & Government
  • Automation
  • Business & Finance
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Business & Finance›Norway: Aker Solutions’ Innovative Belly-Spar Platform for Aasta Hansteen Field
Business & Finance

March 14, 2012 · about 14 years ago

Norway: Aker Solutions’ Innovative Belly-Spar Platform for Aasta Hansteen Field

Aker Solutions has been awarded a FEED (front-end engineering and design) contract from Statoil to design the world’s largest Spar platform for the Aasta Hansteen field development in the Norwegian Sea. With a total hull length of 193 meters and a draught of 170 meters, the Aasta Hansteen (formerly

2 minutes read
  • LinkedIn
  • X
  • Email

Aker Solutions has been awarded a FEED (front-end engineering and design) contract from Statoil to design the world’s largest Spar platform for the Aasta Hansteen field development in the Norwegian Sea.

With a total hull length of 193 meters and a draught of 170 meters, the Aasta Hansteen (formerly named Luva) Spar platform will be the largest of its kind. A Spar platform is a cylinder shaped floating offshore installation. Aasta Hansteen will be the first Spar platform on the Norwegian continental shelf (NCS), and also the world’s first Spar platform with condensate storage capacity – a so called Belly-Spar.

The Belly-Spar concept is an exclusive Aker Solutions design. The ‘belly’ refers to the increased diameter on part of the circular shaped hull, where the condensate storage tanks are located. This gives the Aker Solutions’ Belly-Spar its characteristic shape.

Henning Østvig, head of Front-End & Technology in Aker Solutions says: “The Aasta Hansteen Spar will be the first production platform on the NCS with steel catenary risers. With a water depth of 1300 meters, this is probably the only riser technology that can meet the challenges on the Aasta Hansteen field”.

The steel catenary risers are made of self-supporting steel pipes in a bow shape between the platform and the seabed. The shape helps the risers compensate for the motions on the floating facility.

Innovation

“The Belly-Spar concept is a result of the innovative spirit and culture among our engineers, who have come up with the right solutions for the challenging conditions on the Aasta Hansteen field,” says Valborg Lundegaard, head of Engineering business area in Aker Solutions.

The mooring system for Aasta Hansteen Spar platform consists of a set of polyester lines. “ There are currently no installations on the NCS with polyester mooring. Aasta Hansteen may be the first, and it will definitely be operating in the deepest water,” says Henning Østvig.

The FEED study will be completed in the third quarter of 2012. The contract value is undisclosed.

Aasta Hansteen

The field was discovered in 1997 and lies 300km offshore in the Vøring area. The licence partners are Statoil (75 per cent), ExxonMobil (15 per cent) and ConocoPhillips (10 per cent).

Aker Solutions’ contract party is Aker Engineering & Technology AS.

[mappress] Subsea World News Staff , March 14, 2012; Image: Statoil

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Business & FinanceEquipmentOperations & Maintenance

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Related articles

Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

18 days ago

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

18 days ago