Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Offshore Wind›France: LM Wind Power’s Blades Installed on 6MW Wind Turbine
Offshore Wind

March 21, 2012 · about 14 years ago

France: LM Wind Power’s Blades Installed on 6MW Wind Turbine

LM Wind Power’s 73.5 meter blades became the first 70+ meter blades to be installed when Alstom inaugurated the largest offshore wind turbine in the world on March 19 at Carnet in the Loire-Atlantique region of France. The impressive composite structures have been developed specifically for Alstom’s

2 minutes read
  • LinkedIn
  • X
  • Email

LM Wind Power’s 73.5 meter blades became the first 70+ meter blades to be installed when Alstom inaugurated the largest offshore wind turbine in the world on March 19 at Carnet in the Loire-Atlantique region of France.

The impressive composite structures have been developed specifically for Alstom’s Haliade 150-6MW wind turbine in a close collaboration between the two companies to boost energy capture while keeping loads down. The innovative blade design has already been through several rounds of testing before being installed on the turbine in France.

LM Wind Power VP Sales & Marketing, Ian Telford states: “It was great to see LM blades mounted on the newest and biggest turbine in the world as well as see the excitement this technological leap has made in the offshore world. Our technology enables us to design and manufacture relatively lighter glass fiber and polyester blades for the length, but above all, LM Wind Power has proven ability to handle the industrialization of these blades, which is not easy.”

Alstom’s Haliade 150-6MW turbine has been EDF-EN / Dong Energy’s choice developed in response to a call for tenders launched by the French government that aims to install 3 GW of wind turbine power off French shores by 2015. Depending on the results of the tenders to be announced in April, Alstom and LM Wind Power plan to establish a blade manufacturing facility in Cherbourg with the capacity to produce up to 100 sets of 73.5 meter blades a year. Production is planned to start in 2016.

[mappress]

Offshore WIND staff, March 21, 2012; Image: alstom

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Offshore WindNews

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Ventura Offshore rig staying longer with Eni and Petronas’ Searah in Southeast Asia
  2. 2Last FSRU in seven-vessel conversion program boosts Karpowership’s LNG-to-power value chain
  3. 3SLB’s grand slam with Aramco puts over 450 oil & gas wells on its plate
  4. 4Chevron and Egypt discuss next steps to speed up Mediterranean gas project

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free