Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo
Topics
  • News
  • Contracts & Tenders
  • Authorities & Government
  • Automation
  • Business & Finance
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Business & Finance›Germany: TenneT Invites Tenders for BorWin Alpha Subsea Cable Surveying Services
Business & Finance

March 23, 2012 · about 14 years ago

Germany: TenneT Invites Tenders for BorWin Alpha Subsea Cable Surveying Services

TenneT Offshore GmbH has announced the tender for subsea cable surveying services for the Alpha Ventus BorWin project. The BorWin Alpha in the North Sea is known as the biggest and most remote offshore wind farm cluster project in the world. For the first time in wind power history, the generated po

1 minutes read
  • LinkedIn
  • X
  • Email

TenneT Offshore GmbH has announced the tender for subsea cable surveying services for the Alpha Ventus BorWin project.

The BorWin Alpha in the North Sea is known as the biggest and most remote offshore wind farm cluster project in the world.

For the first time in wind power history, the generated power will be transmitted by ABB HVDC Light, which is a high voltage direct current transmission system enabling long distance power transport with a minimum loss.

The survey included in tender would comprise of cable position marking and hydrographic surveys of the in-service subsea cables.

Scope of the work includes:

– Preparation / submission of written procedures / instructions, regarding the investigations to be conducted;

– Exploration, including mobilisation and demobilisation;

– Implementation of nondestructive measurements distances with choice of route patterns in water depths of approximately 0 m – 40 m;

– Data collection regarding bathymetry using multibeam sonar and mapping of the seafloor using side scan sonar; -Mapping of the seabed;

– Transfer of the data collected in accordance with standards of the client;

– Preparation of a final report (interpretation / analysis of the obtained data) in German and English.

Divided into lots, tenders may be submitted for part or whole, and the deadline for submission is 12 April 2012.

[mappress] Subsea World News Staff , March 23, 2012; Image: ABB

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Business & FinanceOperations & MaintenanceProject & Tenders

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Related articles

Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

17 days ago

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

17 days ago