Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Offshore Wind›Denmark: Avanti to Present Two Service Lifts at EWEA 2012
Offshore Wind

March 28, 2012 · about 14 years ago

Denmark: Avanti to Present Two Service Lifts at EWEA 2012

Avanti Wind Systems presents two newly developed Service Lifts for wind turbines at the EWEA Convention in Copenhagen from 16th-19th April 2012. The new Pegasus is a Rack and Pinion Service Lift guided by the ladder system in the wind turbine. The lift is pulled up and down through pinions geared by

2 minutes read
  • LinkedIn
  • X
  • Email

Avanti Wind Systems presents two newly developed Service Lifts for wind turbines at the EWEA Convention in Copenhagen from 16th-19th April 2012.

The new Pegasus is a Rack and Pinion Service Lift guided by the ladder system in the wind turbine. The lift is pulled up and down through pinions geared by motors on the lift and a rack welded to the ladder system. The new Rack and Pinion Lift is developed by Avanti due to different internals design and tower dimensions, especially adapted for concrete towers of WTG.

The other newly designed Service Lift – Dolphin – is guided by wires. It has a sliding door that can be divided in an upper and a bottom part and the lift can be equipped with windows.

Both new Service Lifts have space for two technicians and their tools. And like the other Service Lifts from Avanti Wind System, the new Pegasus and Dolphin Service Lifts can be put into service already during construction and commissioning of the turbine with the benefit that the technicians making the final installations in the turbine do not have to climb up and down the ladders.

The lifts cannot run if the door is open, but when the lifts are brought to a standstill and the technician is secured on his hook, inspection and repair can be performed from the lift.

Avanti Wind Systems has produced more than 16.000 Service Lifts for wind turbines all over the world, which is more than half of those installed.

All Service Lifts from Avanti Wind Systems are obviously approved according to relevant standards worldwide. They are manufactured with high quality components and seawater resistant aluminum and can be used both onshore and offshore.

[mappress]

Offshore WIND staff, March 28, 2012; Image: avanti

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Offshore WindNews

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Ventura Offshore rig staying longer with Eni and Petronas’ Searah in Southeast Asia
  2. 2Last FSRU in seven-vessel conversion program boosts Karpowership’s LNG-to-power value chain
  3. 3SLB’s grand slam with Aramco puts over 450 oil & gas wells on its plate
  4. 4Chevron and Egypt discuss next steps to speed up Mediterranean gas project

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free