Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Subsea›UK: Fugro Conducts Navitus Bay Geophysical Survey
Subsea

March 28, 2012 · about 14 years ago

UK: Fugro Conducts Navitus Bay Geophysical Survey

Following the success of the preliminary geotechnical coring programme in 2010, Fugro has successfully performed a detailed geophysical survey of Navitus Bay for Eneco Round 3 Development Ltd. Navitus Bay is to the west of the Isle of Wight and lies within Zone 7 of the Crown Estate’s Round 3 UK off

1 minutes read
  • LinkedIn
  • X
  • Email

Following the success of the preliminary geotechnical coring programme in 2010, Fugro has successfully performed a detailed geophysical survey of Navitus Bay for Eneco Round 3 Development Ltd. Navitus Bay is to the west of the Isle of Wight and lies within Zone 7 of the Crown Estate’s Round 3 UK offshore wind farm zones.

The aim of the survey was to acquire sufficient data to carry out the front end engineering and design studies, and to gain a thorough understanding of the zone’s geology and geomorphology. Fugro were tasked with acquiring suitable survey results to support the environmental processes and for the detailed design and installation of the wind turbine foundations and export cables.

The detailed geophysical survey was on the main wind farm area, the export cable routes from the wind farm to the UK mainland, and a met mast location. Various sensors and geophysical techniques were used for the survey including single and multibeam echo sounder, high resolution side scan sonar, sub-bottom profiler, magnetometer and ultra-high resolution multichannel seismic. The integrated survey report provided a detailed image of the seafloor and a geological model of the site.

The Navitus Bay project involved surveying an area of more than 200km² and took around one month to execute.

[mappress] Subsea World News Staff , March 28, 2012; Image: Fugro

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

SubseaBusiness & FinanceOperations & MaintenanceProject & Tenders

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Petrobras locks in 20-year US supply from Sempra’s LNG project in Lone Star State
  2. 2Hanwha Ocean’s design solution allowing LNG carrier’s switch to ammonia gets ABS’ thumbs-up
  3. 3Exmar’s FLNG conversion earns Bureau Veritas’ seal of approval
  4. 4Denmark opens EU’s first full-scale CO2 storage site

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free