Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo
Topics
  • News
  • Contracts & Tenders
  • Authorities & Government
  • Automation
  • Business & Finance
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Business & Finance›ABB Wins Offshore Wind Connection Order from TenneT in Germany
Business & Finance

April 24, 2012 · about 14 years ago

ABB Wins Offshore Wind Connection Order from TenneT in Germany

ABB, the leading power and automation technology group, has won a significant order from the Dutch-German transmission grid operator TenneT to supply an AC (alternating current) power transmission link connecting Nordergründe, an offshore North Sea wind farm, to the mainland grid in Germany. The ord

2 minutes read
  • LinkedIn
  • X
  • Email

ABB, the leading power and automation technology group, has won a significant order from the Dutch-German transmission grid operator TenneT to supply an AC (alternating current) power transmission link connecting Nordergründe, an offshore North Sea wind farm, to the mainland grid in Germany. The order was booked in the first quarter.

The link has a capacity to transmit 111 megawatts (MW) of clean wind power – enough to serve the needs of more than 100,000 households and help save up to 500,000 tons of carbon dioxide emissions per year, once commissioned in 2013, by replacing fossil fueled generation.

“Offshore wind is a fast growing renewable energy resource in Europe, which helps address the need for more power while minimizing environmental impact,” said Brice Koch, head of ABB’s Power Systems division. “ABB provides a wide range of products, systems and services that enable the efficient generation and integration of renewables into the grid.”

As part of the project scope, ABB will design, engineer, supply and install the 155 kilovolt (kV) land and submarine cable system, the onshore and offshore shunt reactors, the onshore 155/220 kV power transformer and the extension of an existing 220 kV substation. The cable system comprises 3×4 kilometers of single-core AC land cable and 28 km of three core AC submarine cable with integrated fiber optics.

ABB has previously received three large orders from TenneT for offshore wind connections with its efficient HVDC Light technology. BorWin1 has already been commissioned and DolWin1 and DolWin2 are under execution. These three connections and Nordergründe were planned before 2011.

ABB has also successfully commissioned nine AC cable projects for offshore wind connections and others are under execution.

[mappress] Subsea World News Staff , April 24, 2012; Image: ABB

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Business & FinanceEquipmentOperations & MaintenanceProject & Tenders

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Related articles

FPSO Cidade de Itajaí; Source: Altera Infrastructure
Business & Finance

Karoon boosts Brazilian field’s oil output with all wells now online

18 days ago

Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

18 days ago

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

FPSO Cidade de Itajaí; Source: Altera Infrastructure
Business & Finance

Karoon boosts Brazilian field’s oil output with all wells now online

18 days ago
Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

18 days ago