Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Subsea›UAE: Prelude FLNG Project Initiated with Turret Steel Cutting
Subsea

May 24, 2012 · about 14 years ago

UAE: Prelude FLNG Project Initiated with Turret Steel Cutting

Drydocks World, the established international player in ship repair, conversion, new building and offshore construction, announced that Shell’s pioneering Prelude Floating Liquefied Natural Gas (FLNG) facility – the world’s first – was initiated with a Steel Cutting ceremony of its Turret, the world

2 minutes read
  • LinkedIn
  • X
  • Email

Drydocks World, the established international player in ship repair, conversion, new building and offshore construction, announced that Shell’s pioneering Prelude Floating Liquefied Natural Gas (FLNG) facility – the world’s first – was initiated with a Steel Cutting ceremony of its Turret, the world’s largest – at more than 90 m in height and 30 m in diameter and weighing 11,500 tonnes.The Ceremony was attended by senior personnel from Shell, Technip, SHI and SBM Offshore.

The Turret will be built as six modules at the Dubai shipyard and shipped to Samsung Heavy Industry’s yard in Korea, where these will be integrated into the FLNG facility, once it is built. Drydocks World had earlier been awarded the Turret building contract by SBM Offshore as part of its contract with Technip for the engineering, procurement and construction (EPC) of the FLNG Turret Mooring System.

Once constructed the FLNG facility will be towed to location where it will be permanently moored in 250m-deep water through the turret, providing weathervaning capabilities, and a 4×4 mooring system. The FLNG facility and its mooring system have been designed to withstand extreme weather conditions including a Category 5 cyclone.

“The shipyard has extensive experience in managing projects of great significance to the world oil and gas industry. It is indeed a matter of great pride to be associated with this historic project, the scope and scale of which is massive and has the capability of defining future developments in the offshore gas industry. Our excellent technical capabilities and stringent adherence to safety and quality standards has enabled us to participate actively in building a major part of the FLNG facility,” said Khamis Juma Buamim, Chairman of Drydocks World and Maritime World.

[mappress] Subsea World News Staff , May 24, 2012; Image: Drydocks World

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

SubseaBusiness & FinanceEquipment

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Petrobras locks in 20-year US supply from Sempra’s LNG project in Lone Star State
  2. 2Hanwha Ocean’s design solution allowing LNG carrier’s switch to ammonia gets ABS’ thumbs-up
  3. 3Exmar’s FLNG conversion earns Bureau Veritas’ seal of approval
  4. 4Denmark opens EU’s first full-scale CO2 storage site

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free