Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Offshore Wind›UK: Ellis Holds London Array Wind Farm Cables
Offshore Wind

May 28, 2012 · about 14 years ago

UK: Ellis Holds London Array Wind Farm Cables

Emperor cable cleats from Yorkshire-based manufacturer, Ellis are being installed on a wind farm project that when complete will power over 470,000 homes. The cleats, which were specified by JDR Cable Systems, are being used on the London Array Offshore Wind Farm, which is currently being built 20km

2 minutes read
  • LinkedIn
  • X
  • Email

Emperor cable cleats from Yorkshire-based manufacturer, Ellis are being installed on a wind farm project that when complete will power over 470,000 homes.

The cleats, which were specified by JDR Cable Systems, are being used on the London Array Offshore Wind Farm, which is currently being built 20km off the Kent and Essex coast in the outer Thames Estuary. Phase one of the project features 175 turbines, two offshore substations and four underwater export cables, and is due for completion by the end of 2012.

Paul Nolan, UK sales manager for Ellis , said: “When complete, phase one of London Array will generate power for close to half a million homes, it is therefore essential that every possible precaution is taken during construction to ensure minimum disruption once the wind farm is operational.”

Like all of its cleats, Ellis’ Emperors are sold with full and proper third party short circuit certification that demonstrates the specified products meet the requirements of the project.

“For a cleat to do the job it is specified for it has to be able to withstand the peak short circuit force generated by the cables in that specific installation,” continued Nolan. “Third party certification, when presented and interpreted correctly, provides proof of this.”

London Array is being developed by a consortium with the following shareholdings: DONG Energy (50 per cent), E.ON (30 per cent) and Masdar (20 percent).

[mappress]

Offshore WIND staff, May 25, 2012; Image: ellispatents

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Offshore WindStorage

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Hybrid electric propulsion at the heart of next-gen LNG carrier design
  2. 2Shell and MET Group pen new multi-year US LNG supply deal
  3. 3New US wave power test facility on Carnegie Clean Energy contender list for potential CETO demo
  4. 4Germany-UAE energy ties deepen as RWE, Masdar and ADNOC eye LNG supply and €3B offshore wind investment

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free