Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo
Topics
  • News
  • Contracts & Tenders
  • Authorities & Government
  • Automation
  • Business & Finance
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Business & Finance›UK: London Array Wind Farm Gets Ellis’ Emperor Cable Cleats
Business & Finance

May 29, 2012 · about 14 years ago

UK: London Array Wind Farm Gets Ellis’ Emperor Cable Cleats

Emperor cable cleats from Yorkshire-based manufacturer, Ellis are being installed on a wind farm project that when complete will power over 470,000 homes. The cleats, which were specified by JDR Cable Systems, are being used on the London Array Offshore Wind Farm, which is currently being built 20km

2 minutes read
  • LinkedIn
  • X
  • Email

Emperor cable cleats from Yorkshire-based manufacturer, Ellis are being installed on a wind farm project that when complete will power over 470,000 homes.

The cleats, which were specified by JDR Cable Systems, are being used on the London Array Offshore Wind Farm, which is currently being built 20km off the Kent and Essex coast in the outer Thames Estuary. Phase one of the project features 175 turbines, two offshore substations and four underwater export cables, and is due for completion by the end of 2012.

Paul Nolan, UK sales manager for Ellis , said: “When complete, phase one of London Array will generate power for close to half a million homes, it is therefore essential that every possible precaution is taken during construction to ensure minimum disruption once the wind farm is operational.”

Like all of its cleats, Ellis’ Emperors are sold with full and proper third party short circuit certification that demonstrates the specified products meet the requirements of the project.

“For a cleat to do the job it is specified for it has to be able to withstand the peak short circuit force generated by the cables in that specific installation,” continued Nolan. “Third party certification, when presented and interpreted correctly, provides proof of this.”

London Array is being developed by a consortium with the following shareholdings: DONG Energy (50 per cent), E.ON (30 per cent) and Masdar (20 percent).

[mappress] Subsea World News Staff, May 29, 2012; Image: Ellis

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Business & FinanceEquipmentOperations & Maintenance

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Related articles

FPSO Cidade de Itajaí; Source: Altera Infrastructure
Business & Finance

Karoon boosts Brazilian field’s oil output with all wells now online

20 days ago

Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

20 days ago

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

FPSO Cidade de Itajaí; Source: Altera Infrastructure
Business & Finance

Karoon boosts Brazilian field’s oil output with all wells now online

20 days ago
Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

20 days ago