Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Subsea›Denmark: Array Cable Installation Starts on Anholt Wind Farm
Subsea

June 7, 2012 · about 14 years ago

Denmark: Array Cable Installation Starts on Anholt Wind Farm

After many months of manufacturing and preparation, it is now time for the array cable installation to commence on the Anholt project. Over the past year, Nexans Deutschland has been manufacturing array cables for the Anholt Offshore Wind Farm in three different cross sections with a total length of

2 minutes read
  • LinkedIn
  • X
  • Email

After many months of manufacturing and preparation, it is now time for the array cable installation to commence on the Anholt project.

Over the past year, Nexans Deutschland has been manufacturing array cables for the Anholt Offshore Wind Farm in three different cross sections with a total length of approximately 150 kilometres. It is a logistical challenge to transport such a large quantity of cables from Nexans’ factory in Hannover, and a combination of road and rail transport and direct loading to installation vessels both in Germany and Denmark are used to transport the cables to the project.

Visser & Smit Marine Contracting (VSMC) has been contracted to perform the array cable installation on the Anholt project and will commence the installation on 1 June. The Stemat 82 cable installation vessel is the first vessel which VSMC will use on the Anholt project.

The vessel has joined the project directly from the London Array project in the United Kingdom. Through great cooperation between Nexans, DONG Energy and VSMC, Stemat 82 left the London Array project on 16 May, was prepared and inspected in Rotterdam Netherlands, loaded with 29 kilometres of array cables in Nordenham Germany and arrived at the project site in Grenaa on 27 May on time and ready to work.

The Stemat 82 will be joined on site in the coming weeks by the Toisa Wave DP2 installation vessel, which will be focussed towards the installation of shorter lengths of cables within the wind farm.

[mappress] Subsea World News Staff, June 07, 2012; Image: VSMC

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

SubseaBusiness & FinanceEquipmentOperations & Maintenance

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Petrobras locks in 20-year US supply from Sempra’s LNG project in Lone Star State
  2. 2Hanwha Ocean’s design solution allowing LNG carrier’s switch to ammonia gets ABS’ thumbs-up
  3. 3Exmar’s FLNG conversion earns Bureau Veritas’ seal of approval
  4. 4Denmark opens EU’s first full-scale CO2 storage site

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free