Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo
Topics
  • News
  • Contracts & Tenders
  • Authorities & Government
  • Automation
  • Business & Finance
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Business & Finance›Caley Takes Part in Deepwater Installation JIP (UK)
Business & Finance

June 12, 2012 · about 14 years ago

Caley Takes Part in Deepwater Installation JIP (UK)

Offshore handling equipment specialist, Caley Ocean Systems is taking part in a Joint Industry Project (JIP) into the Requirements for Certification of fibre rope-based, Deepwater Installation Systems that will ultimately be incorporated in a new standard for Offshore Deployment and Recovery Systems

2 minutes read
  • LinkedIn
  • X
  • Email

Offshore handling equipment specialist, Caley Ocean Systems is taking part in a Joint Industry Project (JIP) into the Requirements for Certification of fibre rope-based, Deepwater Installation Systems that will ultimately be incorporated in a new standard for Offshore Deployment and Recovery Systems.

Managed by Det Norske Veritas (DNV), Phase 1 of the JIP identified generic certification requirements for new technology. The first issue of a draft standard for system certification, DNV-OS-E407 ‘Offshore Deployment & Recovery Systems’, is being prepared for Caley and the other participants. In Phase 2, the JIP is intended to identify product-specific requirements for subsea deployment and recovery operations.

During Phase 3 of the JIP, results from Phase 2 will be used to update the draft DNV-OS-E407, and include methodologies for argumentation of assurance cases (including safety) in the integrated system reliability methods.

“As operators go to greater depths so the challenge of installing heavy subsea equipment safely is a growing concern. Participation in the deepwater installation JIP allows us to share and build on our wide experience in designing and deploying both subsea and oceanographic handling systems,” commented Gregor McPherson, sales director, Caley Ocean Systems.

The final DNV-OS-E407 standard will have a wider scope than the types of fibre-based systems covered in the JIP. Other types of Offshore Deployment & Recovery Systems covered by the standard will include subsea systems utilising steel-wire ropes and hang-off systems using fibre ropes as pendants to extend the reach of an offshore crane.

[mappress] Source: Caley Ocean Systems, June 12, 2012

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Business & FinanceEquipment

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Related articles

FPSO Cidade de Itajaí; Source: Altera Infrastructure
Business & Finance

Karoon boosts Brazilian field’s oil output with all wells now online

20 days ago

Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

20 days ago

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

FPSO Cidade de Itajaí; Source: Altera Infrastructure
Business & Finance

Karoon boosts Brazilian field’s oil output with all wells now online

20 days ago
Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

20 days ago