Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo
Topics
  • News
  • Contracts & Tenders
  • Authorities & Government
  • Automation
  • Business & Finance
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Business & Finance›UK: JDR’s Cables for DONG Energy’s Gunfleet Sands Offshore Wind Farm
Business & Finance

June 13, 2012 · about 14 years ago

UK: JDR’s Cables for DONG Energy’s Gunfleet Sands Offshore Wind Farm

JDR Cable Systems has won its first ever offshore wind farm export wire supply contract. Danish developer Dong has selected the subsea inter-array specialist to manufacture a 12km medium-voltage link for the two-turbine Gunfleet Sands demonstrator. The cable is being produced in JDR’s Hartlepool fac

1 minutes read
  • LinkedIn
  • X
  • Email

JDR Cable Systems has won its first ever offshore wind farm export wire supply contract. Danish developer Dong has selected the subsea inter-array specialist to manufacture a 12km medium-voltage link for the two-turbine Gunfleet Sands demonstrator.

The cable is being produced in JDR’s Hartlepool facilities and will be finished by the end of next month for installation in September. The prototype turbines will go up the following month. The company will also manufacture the inter-array cable for the two 6MW Siemens machines as well as a spare.

The landfall of the export cable is close to Clacton-on-Sea from where onshore wires will tie in to a 33kV distribution network. JDR, the UK’s only inter-array cable manufacturer, is moving into longer medium and high-voltage cables and recently completed a £30m upgrade at its Hartlepool plant. It delivered a 25km export cable to wave energy test centre Wave Hub in 2010 but the Gunfleet Sands 3 job is its first wind export cable outing.

Elsewhere, Dong has awarded Nexans the contract for 122km of inter-array cables at its 389MW West of Duddon Sands wind farm. Installation is slated to begin in the summer of 2013 and the 108 Siemens 3.6MW turbines are due to go live in 2014.

[mappress] Subsea World News Staff , June 13, 2012; Image: JDR

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Business & FinanceEquipmentOperations & Maintenance

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Related articles

Deepsea Nordkapp rig; Source: Odfjell Drilling
Business & Finance

Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year

20 days ago

FPSO Cidade de Itajaí; Source: Altera Infrastructure
Business & Finance

Karoon boosts Brazilian field’s oil output with all wells now online

20 days ago

Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

20 days ago

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Deepsea Nordkapp rig; Source: Odfjell Drilling
Business & Finance

Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year

20 days ago
FPSO Cidade de Itajaí; Source: Altera Infrastructure
Business & Finance

Karoon boosts Brazilian field’s oil output with all wells now online

20 days ago
Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

20 days ago