Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo
Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Shipbuilding›Indian Navy to Procure Survey Vessels from Indigenous Shipyards
Shipbuilding

June 20, 2012 · about 14 years ago

Indian Navy to Procure Survey Vessels from Indigenous Shipyards

Prompted by a desire to renew its underwater preparedness the Indian Navy has launched the process of procuring survey vessels from indigenous shipyards. As confirmed by a Navy official to the Press Trust of India (PTI), the four planned vessels are required to be 100 per cent indigenous, their prim

1 minutes read
  • LinkedIn
  • X
  • Email

Prompted by a desire to renew its underwater preparedness the Indian Navy has launched the process of procuring survey vessels from indigenous shipyards.

As confirmed by a Navy official to the Press Trust of India (PTI), the four planned vessels are required to be 100 per cent indigenous, their primary assignment being conducting hydrographic and oceanographic surveys.

At the same time, the ships, armed with CRN-91 guns will have a limited defense role, but are also required to have the capacity of performing as hospital facilities in case of emergency.

In terms of specifications, the ships should be able to endure a mission time of about eight weeks housing circa 200 crew members.

With 2000-3000 tons of displacement, the estimated speed limit of the vessels will be 18 knots, in addition to the capability of operating one single-engine rotary wing aircraft of six tons and a retractable hangar for parking it.

Moreover, they will be able to cruise at very low speed from zero to six knots for extended period of time.

The life expectancy of the state-of-the art vessels is 25 years.

The construction of the ships and their subsequent commissioning is expected by 2017-18.

[mappress]

World Maritime News Staff, June 20, 2012

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

ShipbuildingNews

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Hybrid electric propulsion at the heart of next-gen LNG carrier design
  2. 2Shell and MET Group pen new multi-year US LNG supply deal
  3. 3New US wave power test facility on Carnegie Clean Energy contender list for potential CETO demo
  4. 4Germany-UAE energy ties deepen as RWE, Masdar and ADNOC eye LNG supply and €3B offshore wind investment

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free