Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo
Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Fossil Energy›Rialto Awards Petrofac with Gazelle Field Development FEED (Ivory Coast)
Fossil Energy

June 26, 2012 · about 14 years ago

Rialto Awards Petrofac with Gazelle Field Development FEED (Ivory Coast)

Rialto has awarded the Front End Engineering Design (FEED) for the Gazelle Field Development to Petrofac. The work will be carried out in Petrofac’s Woking, UK office and is expected to be completed n October 2012. The Gazelle Field lies in Block CI-202 offshore Cote d’Ivoire and is being developed

2 minutes read
  • LinkedIn
  • X
  • Email

Rialto has awarded the Front End Engineering Design (FEED) for the Gazelle Field Development to Petrofac. The work will be carried out in Petrofac’s Woking, UK office and is expected to be completed n October 2012.

The Gazelle Field lies in Block CI-202 offshore Cote d’Ivoire and is being developed by Rialto, as operator, and Petroci (Société Nationale d’Opérations Pétrolières de la Côte d’Ivoire).

The field development plan and gas agreement has been approved by the Cote d’Ivoire authorities and the production facilities will consist of a fixed production platform at the Gazelle Field with separate oil and gas pipelines from the platform to shore. The pipelines will be designed with spare capacity for future production of up to 40,000 bopd and 230 mmscf/d.

Initial production from the platform is expected to be around 8,000 bopd and 100 mmscf/d ramping up in a phased approach to include other existing discoveries in the block. The facilities will process gas and oil to delivery specifications, with the gas being tied into the onshore gas system for use in electrical power generation. Production wells will be drilled by jack-up drilling rig with the first Gazelle Field production well (P-3 ST2) currently in progress.

“Rialto expects to award further contracts for the project by year end in order to achieve a fast track programme to first hydrocarbons, which is expected in early 2014.” said the company in a statement.

[mappress] Press Release, June 26, 2012

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Fossil EnergyBusiness & Finance

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Norwegian PSV to continue current charter for additional 100 days
  2. 2Italy’s NextGeo to open office in Germany
  3. 3TotalEnergies finds more oil off Angola, enters two exploration blocks
  4. 4Odfjell Drilling’s new rig busy until 2031 thanks to deal with Vår Energi

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free