Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo
Topics
  • News
  • Contracts & Tenders
  • Authorities & Government
  • Automation
  • Business & Finance
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Business & Finance›Borders & Southern Fails to Reach All Potential Reservoir Targets in Stebbing Well
Business & Finance

July 16, 2012 · about 14 years ago

Borders & Southern Fails to Reach All Potential Reservoir Targets in Stebbing Well

Borders & Southern reports results from its Stebbing well. Well 61/25-1 was drilled to a total measured depth of 3060m (true vertical depth of 3011m). The well penetrated the upper Tertiary target on prognosis but was unable to reach lower targets due to anomalous pressure conditions. The lower targ

2 minutes read
  • LinkedIn
  • X
  • Email

Borders & Southern reports results from its Stebbing well. Well 61/25-1 was drilled to a total measured depth of 3060m (true vertical depth of 3011m). The well penetrated the upper Tertiary target on prognosis but was unable to reach lower targets due to anomalous pressure conditions. The lower targets remain unevaluated.

The well encountered very strong gas shows (C1 to C5) whilst drilling the Tertiary section. Petrophysical analysis of the wireline logs suggest an interval (2500m to 2651m) of thin bedded siltstones and claystones with a net to gross of 36% and an average porosity of 19%. Due to the thin bedded character of this sequence it was not possible to obtain a clear indication of the fluid type or saturation. The geophysical anomalies identified on seismic are coincident with this zone containing hydrocarbons. The initial assessment is that this upper target is unlikely to be commercial although further technical evaluation is required.

Strong gas shows continued below the upper target. However, progress was slow due to lost circulation and well flows which occurred in consecutive hole sections. Several of these flows contained gas. On each occasion the well was successfully controlled but it became necessary to set additional strings of casing, using the contingency casing considered in the well design. In the final 6″ hole section, the fluid pressures continued to rise giving further well flows and it became impossible to continue drilling whilst maintaining well integrity. A decision was therefore made to cease drilling.

It is very disappointing not to have reached all the potential reservoir targets in this well. The geological and engineering data will now be reviewed in detail in order to understand the complexities of this prospect.

The Company now intends to plug and abandon the well in line with regulatory requirements and assign the rig to Falkland Oil and Gas. An announcement will be made once this has been completed.

Fluid samples from the Darwin discovery are undergoing analysis in the lab and the results are on track to meet the previously reported 10 week timeframe.

[mappress] Press Release, July 16, 2012

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Business & FinanceProject & Tenders

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Related articles

FPSO Cidade de Itajaí; Source: Altera Infrastructure
Business & Finance

Karoon boosts Brazilian field’s oil output with all wells now online

19 days ago

Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

19 days ago

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

FPSO Cidade de Itajaí; Source: Altera Infrastructure
Business & Finance

Karoon boosts Brazilian field’s oil output with all wells now online

19 days ago
Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

19 days ago