Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo
Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Shipbuilding›SADRA to Launch Venezuelan Aframax Tanker on Monday
Shipbuilding

July 20, 2012 · about 14 years ago

SADRA to Launch Venezuelan Aframax Tanker on Monday

On Monday, July 23 Iran-based SADRA Ship Manufacturing Yard will launch the biggest indigenously built tanker, managing director of the company, Engineer Salman Zarbi told the press. The 113,000 dwt Aframax oil tanker will first cast off for three months long sea trials into the waters of the Persia

1 minutes read
  • LinkedIn
  • X
  • Email

On Monday, July 23 Iran-based SADRA Ship Manufacturing Yard will launch the biggest indigenously built tanker, managing director of the company, Engineer Salman Zarbi told the press.

The 113,000 dwt Aframax oil tanker will first cast off for three months long sea trials into the waters of the Persian Gulf, before it is handed over to its Venezuelan owner in November, Mr. Zarbi added, the Tanker Operator reports.

In 2007 Venezuela placed an order for construction of four Aframax oil tankers with the Iranian shipbuilding company. The construction started in 2010 and is well underway. The first tanker from the series is ready for launching, while the second one is about to be transferred to the dry manufacturing workshop pool for full assembly. The shipbuilding process of all four vessels is expected to last 40 months.

According to Mr. Zarbi, construction of each ship costs around €57 mill.

“Manufacturing ships of this size is taking place for the first time both in Iran and in the Middle East and although predicting the costs for the first of a kind of any product of this size is a tough job, we hope to gain between 10 to 15% benefit in this job.”

“The Venezuelan side has paid 20% of the cost of manufacturing the ship, which is €42 mill Euros in the year 2008” , he pointed out.

[mappress]

World Maritime News Staff, July 20, 2012; Image: SADRA

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

ShipbuildingNews

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Hybrid electric propulsion at the heart of next-gen LNG carrier design
  2. 2Shell and MET Group pen new multi-year US LNG supply deal
  3. 3New US wave power test facility on Carnegie Clean Energy contender list for potential CETO demo
  4. 4Germany-UAE energy ties deepen as RWE, Masdar and ADNOC eye LNG supply and €3B offshore wind investment

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free