Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo
Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Shipbuilding›Norway: Bergen Wins Njord Bravo FSO Job
Shipbuilding

August 15, 2012 · about 14 years ago

Norway: Bergen Wins Njord Bravo FSO Job

Bergen Group Rosenberg AS has been awarded a Letter Of Intent (LOI) from Statoil for an onshore modification project on the Njord Bravo-FSO vessel. The contract value is estimated to NOK 212 million (approx. USD 35.7 million)exclusive of options, and includes FEED study activities and EPCIc (Enginee

1 minutes read
  • LinkedIn
  • X
  • Email

Bergen Group Rosenberg AS has been awarded a Letter Of Intent (LOI) from Statoil for an onshore modification project on the Njord Bravo-FSO vessel. The contract value is estimated to NOK 212 million (approx. USD 35.7 million)exclusive of options, and includes FEED study activities and EPCIc (Engineering, Procurement, Construction, Installation and commissioning assistance) scope.

The work scope for the Njord Bravo FSO (Floating Storage and Offloading) Vessel includes amongst others modifications and upgrade of the accommodation, machinery, thrusters and control system. The project also comprises deck and outer hull surface protection, which will be carried out by Kaefer Energy as our main subcontractor, in the dry dock at Bergen Group Rosenberg in Stavanger. Njord B has a length of 240 meters and a storage capacity of 110,000 cubic meters.

The work will commence late august 2012 with 3-4 months FEED study (Front-End Engineering and Design) to mature the concept. Thereafter detailed design and planning will be executed until the docking period which is scheduled to start in June 2013 with duration of 4-5 months.

“Through this contract Bergen Group Rosenberg is able to utilize a wide range of our well established competence and attractive facilities. This work scope will also fit very well with our other on-going activities in the project execution period” , says Kristin Færøvik, CEO for Bergen Group Rosenberg and EVP Bergen Group Offshore .

[mappress]

Source: Bergen Group, August 15, 2012; Image: VTT

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

ShipbuildingBusiness & Finance

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Hybrid electric propulsion at the heart of next-gen LNG carrier design
  2. 2Shell and MET Group pen new multi-year US LNG supply deal
  3. 3New US wave power test facility on Carnegie Clean Energy contender list for potential CETO demo
  4. 4Germany-UAE energy ties deepen as RWE, Masdar and ADNOC eye LNG supply and €3B offshore wind investment

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free