Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Shipbuilding›Iran: Sadra Shipyard Launches Transportation Barge ‘Mahdis II’
Shipbuilding

August 16, 2012 · about 14 years ago

Iran: Sadra Shipyard Launches Transportation Barge ‘Mahdis II’

Sadra Shipbuilding Plant in Busher has launched its second barge for transportation of platform jackets for the offshore South Pars field developments. The vessel was built in six months. Mahdis II, a 1,500-metric ton (1,654-ton) vessel, is 84 m (275 ft) long, with a breadth of 27 m (88 ft), height

1 minutes read
  • LinkedIn
  • X
  • Email

Sadra Shipbuilding Plant in Busher has launched its second barge for transportation of platform jackets for the offshore South Pars field developments. The vessel was built in six months.

Mahdis II, a 1,500-metric ton (1,654-ton) vessel, is 84 m (275 ft) long, with a breadth of 27 m (88 ft), height of 6 m (19 ft), and draft of 4.7 m (15 ft). Its loading capacity is 7,000 metric tons (7,716 tons). This vessel and its forerunner Mahdis I, launched last year, will transport jackets for South Pars phases 13 and 22. Previously, Iran used foreign chartered vessels for transportation programs.

The second 2,000-metric ton (2,205-ton) jacket for the South Pars A-19 platform has been installed at its offshore location.

A second drilling derrick, designed to drill five wells, should head offshore shortly. The C-19 derrick is deployed at the South Pars 19 site. Phase 19 calls for drilling 21 wells.

Petropars and Iranian Offshore Engineering and Construction Co. are responsible for the development, designed to deliver 50 MMcm/d (1.76 bcf/d) of sweet gas, 75,000 b/d of gas condensates, 400 tons of sulfur, and annual production of 1.05 MM tons of liquefied gas and 1 MM tons of ethane.

[mappress] Source: PARS, August 16, 2012; Image: Sadra

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

ShipbuildingBusiness & Finance

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Hybrid electric propulsion at the heart of next-gen LNG carrier design
  2. 2Shell and MET Group pen new multi-year US LNG supply deal
  3. 3New US wave power test facility on Carnegie Clean Energy contender list for potential CETO demo
  4. 4Germany-UAE energy ties deepen as RWE, Masdar and ADNOC eye LNG supply and €3B offshore wind investment

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free