Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Shipbuilding›Hull of RAN’s New Amphibious Ship Leaves Spanish Port
Shipbuilding

August 20, 2012 · about 14 years ago

Hull of RAN’s New Amphibious Ship Leaves Spanish Port

Minister for Defence Materiel Jason Clare today announced the departure of the hull of the first of the Royal Australian Navy’s (RAN’s) new amphibious ships from Ferrol in northern Spain. Mr Clare said the Landing Helicopter Dock (LHD) 01 hull will be transported to Melbourne, Australia, by the Heav

2 minutes read
  • LinkedIn
  • X
  • Email

Minister for Defence Materiel Jason Clare today announced the departure of the hull of the first of the Royal Australian Navy’s (RAN’s) new amphibious ships from Ferrol in northern Spain.

Mr Clare said the Landing Helicopter Dock (LHD) 01 hull will be transported to Melbourne, Australia, by the Heavy Lift Ship, Blue Marlin. The hull was built in the Navantia shipyard in Spain.

“ The trip is expected to take approximately seven weeks depending on weather conditions ,” Mr Clare said.

The Canberra Class LHDs are bigger than Australia’s last aircraft carrier HMAS Melbourne. When completed they will be more than 230 metres long, 27.5 metres high and weigh around 27,500 tonnes.

Mr Clare said each ship can carry a combined arms battle group of more than 1100 personnel, 100 armoured vehicles and 12 helicopters and features a 40-bed hospital.

“ On arrival in Australian waters the ship will transit to Port Phillip Bay, Melbourne and then on to the Williamstown dockyard for consolidation of the superstructure and installation of the combat and communications and navigation systems. This will be followed by sea trials ,” he said.

The vessel is scheduled to be delivered to the RAN in early 2014.

The hull of LHD 02 was launched on 4 July from the Navantia shipyard in a ceremony attended by the Chief of Navy, Vice Admiral Ray Griggs. When complete, LHD 02 will be commissioned as HMAS Adelaide.

[mappress] World Maritime News Staff, August 20, 2012; Image: Australian Defence

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

ShipbuildingNews

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Hybrid electric propulsion at the heart of next-gen LNG carrier design
  2. 2Shell and MET Group pen new multi-year US LNG supply deal
  3. 3New US wave power test facility on Carnegie Clean Energy contender list for potential CETO demo
  4. 4Germany-UAE energy ties deepen as RWE, Masdar and ADNOC eye LNG supply and €3B offshore wind investment

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free