Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Fossil Energy›Statoil, Petoro Splashing $1.4 Bln to Boost Gullfaks South Production (Norway)
Fossil Energy

August 22, 2012 · about 14 years ago

Statoil, Petoro Splashing $1.4 Bln to Boost Gullfaks South Production (Norway)

Statoil and its partner Petoro have decided to further develop Gullfaks South in the North Sea by investing NOK 8.5 billion (USD 1.44 billion) in two new subsea templates and six extra wells. This will boost recovery by 65 million barrels of oil equivalent. Increasing recovery from Gullfaks South wi

2 minutes read
  • LinkedIn
  • X
  • Email

Statoil and its partner Petoro have decided to further develop Gullfaks South in the North Sea by investing NOK 8.5 billion (USD 1.44 billion) in two new subsea templates and six extra wells. This will boost recovery by 65 million barrels of oil equivalent.

Increasing recovery from Gullfaks South will be implemented as part of Statoil’s fast-track developments.

“By using the fast-track concept, with standardised solutions and consistent teams in one project, we will improve recovery in an effective manner,” says Halfdan Knudsen , vice president for fast-track projects on the Norwegian continental shelf (NCS).

Production in parts of Gullfaks South was shut down in 2008 to maintain an acceptable pressure level in the reservoir for future drilling operations.

Existing wells are being reopened in the course of 2012. And new wells will also be drilled from existing seabed templates on Gullfaks South.

Recovery will be increased further with the fast-track concept and production start-up is planned from 2014.

“We’re now making a substantial investment in a mature field,” says Jannicke Nilsen, senior vice president for the operations North Sea west cluster.

“This is a major commitment to increasing recovery and it is in line with Statoil’s continuous focus on increased recovery in existing fields on the NCS.”

This will be the second fast-track development to be tied back to Gullfaks for processing and it exploits spare capacity on one of the big producers on the NCS (Visund South was resolved in 2011).

Two available well slots will provide flexibility and further reserves could be realised. The project will help to utilise spare processing capacity and extend the lifetime of Gullfaks A beyond 2030.

[mappress] Press Release, August 22, 2012

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Fossil EnergyBusiness & Finance

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Saipem hands Saudi jack-up fleet to ADES in strategic shallow-water exit
  2. 2Valeura advances Gulf of Thailand expansion with PTTEP farm-in approval
  3. 3Santos broadens Asia-Pacific LNG portfolio with Canadian supply and 10-year POSCO deal
  4. 4Borr Drilling keeps three jack-up rigs as it reorganizes Mexico ops with stake sale

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free