Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo
Topics
  • News
  • Contracts & Tenders
  • Authorities & Government
  • Automation
  • Business & Finance
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Business & Finance›EGS Conducts Cable Route Survey between Orkney Islands and Caithness
Business & Finance

August 23, 2012 · about 14 years ago

EGS Conducts Cable Route Survey between Orkney Islands and Caithness

During April 2012 EGS (International) Ltd were contracted to carry out a pre-installation cable route survey between the Orkney Islands and the Scottish north coast at Caithness. The scope of work involved a geophysical survey of a 70km long 560m wide cable route corridor, a geotechnical survey alon

2 minutes read
  • LinkedIn
  • X
  • Email

During April 2012 EGS (International) Ltd were contracted to carry out a pre-installation cable route survey between the Orkney Islands and the Scottish north coast at Caithness.

The scope of work involved a geophysical survey of a 70km long 560m wide cable route corridor, a geotechnical survey along the route comprising cone penetration tests (CPTs), and vibrocores, and an environmental survey comprising grab sampling and seabed imagery.

During the survey, MBES data was acquired using the vessel‘s hull mounted Reson 7125 system. In order to reduce the number of separately towed sensors, a combined SSS, SBP and magnetometer solution was used.

Upon completion of the geophysical operations the MV Neptune returned to port to re-configure for geotechnical operations. A total of 35 CPT and 35 vibrocore locations were identified. These were alternatively spaced at approximately 1km interval along the proposed main cable route.

EGSi have chartered the MV Neptune on two projects during Q1 and Q2 of 2012. Throughout both projects, the vessel provided a very reliable and efficient working platform with no down time attributable to the vessel on either project. Having a chartered vessel which is equipped with the latest specification of positioning and multibeam systems, this vastly reduced the installation and calibration times for both projects. Feedback from EGSi personnel on board was always positive, with all members of the vessel‘s crew being very helpful and pro-active. The MV Neptune also delivered a high standard of accommodation and victualing which also greatly enhanced the crews experience on board.

[mappress] Press Release, August 23, 2012

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Business & FinanceOperations & Maintenance

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Related articles

FPSO Cidade de Itajaí; Source: Altera Infrastructure
Business & Finance

Karoon boosts Brazilian field’s oil output with all wells now online

22 days ago

Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

22 days ago

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

FPSO Cidade de Itajaí; Source: Altera Infrastructure
Business & Finance

Karoon boosts Brazilian field’s oil output with all wells now online

22 days ago
Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

22 days ago