Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Shipbuilding›Russia: Baltiysky Zavod Shipyard Inks USD 1.2 Bln Icebreaker Contract
Shipbuilding

August 24, 2012 · about 14 years ago

Russia: Baltiysky Zavod Shipyard Inks USD 1.2 Bln Icebreaker Contract

On the 23rd of August in Moscow on ROSATOM’s premises the signing of a contract for building of the pilot universal new generation nuclear icebreaker was held. The contract was signed by Director General of Rosatomflot and Acting Director General of Baltiysky Zavod in the presence of First Deputy Di

2 minutes read
  • LinkedIn
  • X
  • Email

On the 23rd of August in Moscow on ROSATOM’s premises the signing of a contract for building of the pilot universal new generation nuclear icebreaker was held. The contract was signed by Director General of Rosatomflot and Acting Director General of Baltiysky Zavod in the presence of First Deputy Director General and Director of the Nuclear Weapons Complex Directorate and Vice President of the United Shipbuilding Corporation.

An open tender for the right of signing the contract for building the pilot universal nuclear icebreaker of Project 22220 of 60 megawatt capacity was won by Baltijskiy Zavod. The contract cost is RUB 36.959 billion (approx $ 1.2 Bln ). The building process should be completed in December 2017.

Bids were invited on June 29 this year. According to the Federal Law No. 94-FZ of 21.07.2005, the contract will be awarded to Baltijskiy Zavod-Sudostroyenie.

By her technical characteristics, the universal nuclear icebreaker is a double-draught ship capable of operating in both the Northern Sea Route lines and rivers of the Arctic region, and of replacing the existing nuclear icebreakers Arktika and Taimyr. Owing to a greater width (34 m) than the existing icebreakers (30 m), the universal nuclear icebreaker will be able alone to steer tankers of up to 70,000 tons displacement in the Arctic. It will be for the first time that an icebreaker capable of passing 3-meter thick ice is built.

The icebreaker detailed design was developed by CDB Aisberg in 2009. The new nuclear-propelled ship will differ from the previous generation of icebreakers in a special ballast system, which will allow her changing draught from the maximum to minimum one over a certain period of time. Filling her ballast tanks with water, the nuclear icebreaker will “settle down” and raise her going in severe ice conditions. At the approach of the Siberian rivers where the ship’s draught should be not more than 8.5 meters, the ship will drain the ballast and plane up.

The nuclear power installation will use a new integral reactor RITM-200 designed by ROSATOM’s Nizhniy Novgorod-based OKBM Afrikantov. It will be more reliable, economical (the core needs refueling once in seven years) and nearly twice smaller than existing reactors.

The icebreaker assigned service life is 40 years.

[mappress]

World Maritime News, August 24, 2012; Image: rosmorport

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

ShipbuildingNews

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Hybrid electric propulsion at the heart of next-gen LNG carrier design
  2. 2Shell and MET Group pen new multi-year US LNG supply deal
  3. 3New US wave power test facility on Carnegie Clean Energy contender list for potential CETO demo
  4. 4Germany-UAE energy ties deepen as RWE, Masdar and ADNOC eye LNG supply and €3B offshore wind investment

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free