Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo
Topics
  • News
  • Contracts & Tenders
  • Authorities & Government
  • Automation
  • Business & Finance
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Business & Finance›Framo Bags Subsea Contract for Shell’s Draugen Field (Norway)
Business & Finance

August 27, 2012 · about 14 years ago

Framo Bags Subsea Contract for Shell’s Draugen Field (Norway)

Framo Engineering, a Schlumberger company, today announced that A/S Norske Shell has awarded the company a 100-million USD contract for the supply of a complete subsea multiphase booster pump system for the Draugen Field in Norway. The contract includes a complete system for topside power and contro

1 minutes read
  • LinkedIn
  • X
  • Email

Framo Engineering, a Schlumberger company, today announced that A/S Norske Shell has awarded the company a 100-million USD contract for the supply of a complete subsea multiphase booster pump system for the Draugen Field in Norway.

The contract includes a complete system for topside power and control, the power and control umbilical, and the complete subsea pump module and manifold. The subsea multiphase booster pump system, which will be installed at some 250 meters water depth, has been designed to contribute to increased oil production in the Draugen Field.

“The world’s first prototype subsea multiphase pump was installed at the Draugen Field in 1994 by Framo. We are pleased to have Shell, a major international subsea player and instrumental in the early phases of the development of our subsea pump systems, engaging our multiphase pumps and subsea process systems,” said Ole Steine, managing director, Framo Engineering. “We look forward to the challenge entrusted to us by Shell, and we are confident in the technology and our Framo team’s support to our customer for this important subsea industry milestone.”

The Draugen subsea multiphase booster pump system will be assembled and tested at the new Framo Engineering advanced test facility in Hosoey, Norway. Field installation is planned for the summer of 2014.

[mappress]

Press Release, August 27, 2012; Image: Shell

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Business & FinanceEquipmentOperations & MaintenanceProject & Tenders

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Related articles

FPSO Cidade de Itajaí; Source: Altera Infrastructure
Business & Finance

Karoon boosts Brazilian field’s oil output with all wells now online

19 days ago

Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

19 days ago

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

FPSO Cidade de Itajaí; Source: Altera Infrastructure
Business & Finance

Karoon boosts Brazilian field’s oil output with all wells now online

19 days ago
Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

19 days ago