Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Subsea›Japan: Mitsubishi Lays Keel for Ramform Titan
Subsea

September 5, 2012 · about 14 years ago

Japan: Mitsubishi Lays Keel for Ramform Titan

This is the second important milestone in the construction process of the Ramform Titan, which is progressing according to plan. The Ramform Titan is being built by Mitsubishi Heavy Industries Ltd (MHI) in Japan, using the latest shipbuilding methodology, in prefabricated blocks. Block production is

1 minutes read
  • LinkedIn
  • X
  • Email

This is the second important milestone in the construction process of the Ramform Titan, which is progressing according to plan.

The Ramform Titan is being built by Mitsubishi Heavy Industries Ltd (MHI) in Japan, using the latest shipbuilding methodology, in prefabricated blocks.

Block production is now completed and all 22 elements are ready for assembly. Over the coming weeks these will be hoisted one by one into the dry dock in a process known as “vessel erection”. By the end of November the vessel will be afloat.

Block construction involves the assembly of prefabricated sections. Cross-sections of the superstructure are pre-built in the yard, taken to the building dock and then hoisted into position and attached. Equipment components and utilities are built into the blocks, including pipes, plumbing, electrical cables and all major equipment. This means less effort is required once the hull is welded together.

After floating the remaining time will be spent on outfitting, putting in place connections, building the interior, commissioning, and related tasks.

The Ramform Titan is due for delivery first quarter 2013.

[mappress]

Press Release, September 05, 2012; Image: pgs

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

SubseaNews

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Ventura Offshore rig staying longer with Eni and Petronas’ Searah in Southeast Asia
  2. 2Last FSRU in seven-vessel conversion program boosts Karpowership’s LNG-to-power value chain
  3. 3SLB’s grand slam with Aramco puts over 450 oil & gas wells on its plate
  4. 4Chevron and Egypt discuss next steps to speed up Mediterranean gas project

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free