Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo
Topics
  • News
  • Contracts & Tenders
  • Authorities & Government
  • Automation
  • Business & Finance
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Business & Finance›MOSS Reviews Permanent Platform Wire Replacement (USA)
Business & Finance

September 7, 2012 · about 14 years ago

MOSS Reviews Permanent Platform Wire Replacement (USA)

InterMoor successfully replaced (8) spiral-strand platform wires on a permanent production facility in May 2011 without requiring a platform shutdown or loss of production. The operation was completed using a single Construction Anchor-Handling Vessel (CAHV) at a significant cost savings from the tr

2 minutes read
  • LinkedIn
  • X
  • Email

InterMoor successfully replaced (8) spiral-strand platform wires on a permanent production facility in May 2011 without requiring a platform shutdown or loss of production. The operation was completed using a single Construction Anchor-Handling Vessel (CAHV) at a significant cost savings from the traditional method involving a derrick barge.

Each mooring line consisted of unjacketed spiral-strand wire at the fairlead, two sections of jacketed spiral strand in the water column and studless chain at the seafloor. Syntactic-foam submersible buoys had been installed at each spiral-strand wire connection, so each mooring line had two buoys.

Only the platform wires were to be replaced, and the remaining mooring components including the buoys were to be reused. Protecting the existing components from damage during recovery and reinstallation posed several unique challenges. One of the main operational challenges was to design a way to bring the upper buoy and platform wire out of the water and secure them on deck so that the old platform wire could be disconnected. To accomplish this, InterMoor designed and installed a custom hang-off porch at the CAHV’s stern. The porch used a combination of pneumatic and hydraulic cylinders to manipulate and align the entire porch as each buoy connection was recovered and deployed. The porch also had separate stoppers for the socket connections and a removable cradle for the buoy. Another operational challenge was the unknown condition of the buoys themselves, particularly since they were to be reused on the replacement wires. There was no industry experience at the time in retrieving foam buoys that had remained submerged at depth for over a decade. This paper will explore these challenges and others in more detail as well as the steps that were taken to successfully overcome them.

[mappress]

Press Release, September 07, 2012

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Business & FinanceEquipmentProject & Tenders

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Related articles

Deepsea Nordkapp rig; Source: Odfjell Drilling
Business & Finance

Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year

19 days ago

FPSO Cidade de Itajaí; Source: Altera Infrastructure
Business & Finance

Karoon boosts Brazilian field’s oil output with all wells now online

19 days ago

Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

19 days ago

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Deepsea Nordkapp rig; Source: Odfjell Drilling
Business & Finance

Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year

19 days ago
FPSO Cidade de Itajaí; Source: Altera Infrastructure
Business & Finance

Karoon boosts Brazilian field’s oil output with all wells now online

19 days ago
Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

19 days ago