Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo
Topics
  • News
  • Contracts & Tenders
  • Authorities & Government
  • Automation
  • Business & Finance
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Business & Finance›ESS Increases Size of Its Engineering Division (UK)
Business & Finance

September 10, 2012 · about 14 years ago

ESS Increases Size of Its Engineering Division (UK)

Energy technology company, Ecosse Subsea Systems, (ESS) has increased the size of its engineering division in response to client demand for specialist engineering packages. Aberdeen-based ESS specialises in trenching, deepwater installation and subsea lifting technologies for the oil and gas, marine

2 minutes read
  • LinkedIn
  • X
  • Email

Energy technology company, Ecosse Subsea Systems, (ESS) has increased the size of its engineering division in response to client demand for specialist engineering packages.

Aberdeen-based ESS specialises in trenching, deepwater installation and subsea lifting technologies for the oil and gas, marine and renewable industries, and has a range of patented technologies in development.

The new division will complement ESS’ well established consultancy service and will be headed up by chartered engineers David Hunt and Faris Lutfy .

Mr Hunt has extensive experience in subsea construction and operations and was previously in a senior role with Flexlife and Acergy Group. Mr Lutfy has worked on major EPIC design, manufacture and installation projects while employed in senior roles at Subsea 7 and DOF Subsea UK Ltd.

Ecosse Subsea Systems managing director, Mike Wilson , said: “We have been listening to our clients and recognised there was a requirement for a service which could combine first class engineering with extensive offshore installation experience.

“Our engineering division will see a project through from conception to execution and final installation and will offer consistency and quality which is to some extent lacking in the current market. We can take on precommissioning and decommissioning projects and anything in between, from installation of risers to platform, pipeline and umbilical installations.”

Mr Wilson added: “ We think there is real value for clients to be able to call on hands-on engineers who can take their clever solutions from the drawing board and carry the project all the way through to completion.”

[mappress]

Press Release, September 10, 2012

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Business & FinanceEquipmentTechnology

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Related articles

FPSO Cidade de Itajaí; Source: Altera Infrastructure
Business & Finance

Karoon boosts Brazilian field’s oil output with all wells now online

12 days ago

Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

12 days ago

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

FPSO Cidade de Itajaí; Source: Altera Infrastructure
Business & Finance

Karoon boosts Brazilian field’s oil output with all wells now online

12 days ago
Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

12 days ago