Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo
Topics
  • News
  • Contracts & Tenders
  • Authorities & Government
  • Automation
  • Business & Finance
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Business & Finance›InterMoor Completes Conductors for Papa Terra Project (Brazil)
Business & Finance

September 11, 2012 · about 14 years ago

InterMoor Completes Conductors for Papa Terra Project (Brazil)

InterMoor, an Acteon company, has completed installation of the drilling and production conductors for the Papa Terra project, announced Global President Tom Fulton. Petrobras serves as the operator of the Papa Terra concession with a 62.5 percent interest; Chevron holds the remaining 37.5 percent i

2 minutes read
  • LinkedIn
  • X
  • Email

InterMoor, an Acteon company, has completed installation of the drilling and production conductors for the Papa Terra project, announced Global President Tom Fulton. Petrobras serves as the operator of the Papa Terra concession with a 62.5 percent interest; Chevron holds the remaining 37.5 percent interest.

InterMoor was responsible for the design, procurement, fabrication and installation of 15 conductors for the project. Fabricated at InterMoor’s 24-acre, Morgan City, La., facility, the conductors are 36 inches (91 centimeters) in diameter and 187 feet (57 meters) long.

InterMoor chartered the Skandi Skolten, DOF Subsea’s Construction Anchor Handling Vessel, and the installation barge with a customized conductor launch system. For conductor driving, InterMoor used MENCK’s MHU-270T DWS which included a deepwater hydraulic hammer capable of providing a driving energy of 270 kilojoules at a water depth of 3,281 feet (1000 meters) combined with MENCK’s girdle-type electro-hydraulic power pack and umbilical support system. Generating hydraulic power at depth, rather than at the surface, means no hydraulic hose, therefore minimalizing environmental impact and energy loss.

The conductors were installed in water depths of 3,937 feet (1,200 meters) in the southern Campos Basin off the coast of Brazil. The installation took place in April 2012. InterMoor’s conductor services optimize conductor design to meet project-specific load and fatigue requirements, and the unique patented installation method allows installation without the need of a construction vessel. A standard Anchor Handling Vessel is sufficient, leading to a more economical installation off the rig’s critical path.

“We are proud to have successfully completed this important installation for Petrobras and to be part of the first offshore tension-leg, wellhead platform in Brazil,” said Fulton. “Our collaboration with sister company MENCK proved to be an effective partnership, and InterMoor remains the only company worldwide to offer a full conductor installation service in deep water.”

“InterMoor has been developing its strength in the Brazil market through our office in Rio de Janeiro, and this project completion confirms the breadth of our capabilities in the region,” added John Riggs, Managing Director for InterMoor do Brasil.

[mappress]

Press Release, September 11, 2012

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Business & FinanceEquipmentOperations & Maintenance

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Related articles

FPSO Cidade de Itajaí; Source: Altera Infrastructure
Business & Finance

Karoon boosts Brazilian field’s oil output with all wells now online

22 days ago

Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

22 days ago

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

FPSO Cidade de Itajaí; Source: Altera Infrastructure
Business & Finance

Karoon boosts Brazilian field’s oil output with all wells now online

22 days ago
Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

22 days ago