Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo
Topics
  • News
  • Contracts & Tenders
  • Authorities & Government
  • Automation
  • Business & Finance
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Business & Finance›SMM 2012: DNV, AMOS Launch Inspection and Maintenance System for Ships
Business & Finance

September 11, 2012 · about 14 years ago

SMM 2012: DNV, AMOS Launch Inspection and Maintenance System for Ships

DNV and AMOS system supplier SpecTec have launched an all-in-one planned inspection and maintenance system for ship structures. AMOS is a system that crew and management are already familiar with, and in combination with DNV’s Hull Integrity Management system, the software’s accessibility further si

2 minutes read
  • LinkedIn
  • X
  • Email

DNV and AMOS system supplier SpecTec have launched an all-in-one planned inspection and maintenance system for ship structures.

AMOS is a system that crew and management are already familiar with, and in combination with DNV’s Hull Integrity Management system, the software’s accessibility further simplifies inspection planning, reporting and monitoring.

The new combined application uses the DNV vessel-specific hull inspection forms and procedures that come as part of the Hull Integrity Management (HIM) system. The easy-to-use software has unique 3D inspection and reporting functionality that helps with the early detection of defects so they can be dealt with before they lead to costly off-hire time.

HIM adds a further dimension to the AMOS planned maintenance system which supports tasks such as maintenance, efficient spare parts logistics and the production of quality and safety documentation. A vessel structure model is established in the AMOS component hierarchy, and it is combined with HIM’s vessel-specific hull inspection information and any diagrams showing areas that require special attention.

According to Richard Tao, DNV’s HIM service development manager , HIM gives shipowners an easy to use platform to plan, manage and input data gathered during routine on-board hull inspections. It eases the implementation and enhances the control and monitoring.. “Hull inspection planning and monitoring is critical to vessel safety, and our partnership with SpecTec brings connectivity and functionality that meets the growing needs in the industry,” he says.

Hull inspection data is automatically synchronised by AMOS data communication so that it is available to crew, managers, charterers, inspectors and specialists. The system meets ISM, TSMA, OVMSA, OCIMF and vetting requirements.

“Over the last 30 years, AMOS has become the de facto standard in shipping for technical management. Our cooperation with DNV adds the ability to provide structure related maintenance and monitoring so that the ship management can track structural and coating condition including repairs with statistics that can be benchmarked from vessel to fleet,” says Giampiero Soncini, CEO of SpecTec , part of the Volaris Group.

[mappress]

Source: DNV, September 11, 2012

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Business & FinanceEvents

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Related articles

FPSO Cidade de Itajaí; Source: Altera Infrastructure
Business & Finance

Karoon boosts Brazilian field’s oil output with all wells now online

10 days ago

Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

10 days ago

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

FPSO Cidade de Itajaí; Source: Altera Infrastructure
Business & Finance

Karoon boosts Brazilian field’s oil output with all wells now online

10 days ago
Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

10 days ago