Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo
Topics
  • News
  • Contracts & Tenders
  • Authorities & Government
  • Automation
  • Business & Finance
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Equipment›Kawasaki Delivers Gas Engine Power Plant, Japan
Equipment

September 12, 2012 · about 14 years ago

Kawasaki Delivers Gas Engine Power Plant, Japan

Kawasaki Heavy Industries, Ltd. announced that it has delivered a 110 MW gas engine power plant to Nihon Techno, a power producer and supplier. Kawasaki was awarded a full turnkey contract in October 2011 to supply the power plant for Nihon Techno’s Sodegaura Green Power Project. The 110 MW power pl

2 minutes read
  • LinkedIn
  • X
  • Email

Kawasaki Heavy Industries, Ltd. announced that it has delivered a 110 MW gas engine power plant to Nihon Techno, a power producer and supplier.

Kawasaki was awarded a full turnkey contract in October 2011 to supply the power plant for Nihon Techno’s Sodegaura Green Power Project. The 110 MW power plant, constructed in Sodegaura, Chiba Prefecture, consists of 14 Kawasaki Green Gas Engines with a unit capacity of 7,800 kW and the world’s highest generating efficiency of 49.0%. For the project, Kawasaki handled everything from plant design to the supply and installation of plant equipment as well as civil works. The delivery was completed in less than 10 months, and all 14 units in the power plant go into commercial operation.

Kawasaki’s proprietary Green Gas Engines come in two types, a standard model with an electric efficiency of 48.5% and a high-efficiency model with an electric efficiency of 49.0%. Providing superior economic and environmental performance, both types of this innovative gas engine boast low NOx emissions (less than 200 ppm at 0% O2) and cut fuel costs by more than 5% over existing gas engines in their class. Thanks to their low-NOx emissions, the Kawasaki Green Gas Engines require no additional de-NOx system in most areas of Japan. Equipped with electric spark ignition systems, these light-weight and compact engines also do away with the need for liquid fuel.

This order is a testimony to the high evaluation accorded to the outstanding electric efficiency and environmental performance of the Kawasaki Green Gas Engine, as well as its various features including the fast start-up and loading capability that attains maximum load within only 10 minutes. A multi-unit configuration of these gas engines enables highly reliable plant operation, minimizing unexpected power output, and provides superior flexibility, realizing high electric efficiency at various partial loads. Easy operation with the DDS (Daily Start and Stop) system is also a feature that sets this engine apart.

Needs for distributed power systems including small and medium scale utility and captive power plants are increasing to ensure a stable power supply. Kawasaki is continually moving forward to meet those needs and further grow its energy and environmental business through the marketing of its innovative gas engines and other power systems.

[mappress] LNG World News Staff, September 12, 2012; Image: Kawasaki

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Equipment

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Related articles

Neptun Deep jacket; Source: Saipem
Business & Finance

Jacket for EU’s largest offshore gas development sails away from Saipem’s shipyard

about 1 month ago

Red Rock commissions Nexans Electra’s crane systems
Business Developments & Projects

Red Rock commissions Nexans Electra’s crane systems

about 2 months ago

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Neptun Deep jacket; Source: Saipem
Business & Finance

Jacket for EU’s largest offshore gas development sails away from Saipem’s shipyard

about 1 month ago
Red Rock commissions Nexans Electra’s crane systems
Business Developments & Projects

Red Rock commissions Nexans Electra’s crane systems

about 2 months ago