Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Fossil Energy›Talisman Gets Permission to Drill a Well in Norwegian North Sea
Fossil Energy

September 13, 2012 · about 14 years ago

Talisman Gets Permission to Drill a Well in Norwegian North Sea

The Norwegian Petroleum Directorate has granted Talisman Energy Norge AS a drilling permit for well 16/10-5, cf. Section 8 of the Resource Management Regulations. Well 16/10-5 will be drilled from the drilling facility Mærsk Giant at position 58°00’1.37’’ north 02°07’59.99’’ east for Talisman Energy

1 minutes read
  • LinkedIn
  • X
  • Email

The Norwegian Petroleum Directorate has granted Talisman Energy Norge AS a drilling permit for well 16/10-5, cf. Section 8 of the Resource Management Regulations.

Well 16/10-5 will be drilled from the drilling facility Mærsk Giant at position 58°00’1.37’’ north 02°07’59.99’’ east for Talisman Energy Norge AS in production licence 568.

The drilling program for well 16/10-5 concerns the drilling of a wildcat well in production licence 568. Talisman is the operator with an ownership interest of 40 per cent. The other licensees are Petoro AS (20 per cent), Det norske oljeselskap ASA (20 per cent), Edison International Norway Branch (10 per cent) and Skagen44 AS (10 per cent).

The area in this licence consists of parts of blocks 7/1, 7/2 and 16/10. The well will be drilled about ten kilometres southeast of discovery 15/12-12 Rev 5 in the central part of the North Sea.

Production licence 568 was awarded on 4 February 2011 (APA 2010). This is the first well to be drilled in the licence.

The permit is contingent upon the operator having secured all other permits and consents required by other authorities before the drilling starts.

[mappress] Press Release, September 13, 2012

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Fossil EnergyBusiness & Finance

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Halliburton bags Eni’s deepwater bundle as Eastern Mediterranean gas buildout continues
  2. 2TechnipFMC picks up multimillion-dollar subsea scope for Petronas’ deepwater project
  3. 3Southeast Asia’s hydrocarbon push: Valeura hits oil pay, eyes new satellite development
  4. 4FSRU docks in Stade as LNG terminal prepares to feed gas into German grid from November

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free