Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo
Topics
  • News
  • Contracts & Tenders
  • Authorities & Government
  • Automation
  • Business & Finance
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Business & Finance›USA: Petrobras Begins Production in Chinook Field
Business & Finance

September 14, 2012 · about 14 years ago

USA: Petrobras Begins Production in Chinook Field

On September 6, 2012, Petrobras began oil production in the ultra-deep waters of the Chinook oil field from the floating production, storage and offloading platform, FPSO BW Pioneer, moored some 250 kilometers off the coast of the State of Louisiana in the U.S. Gulf of Mexico. It is the first FPSO t

2 minutes read
  • LinkedIn
  • X
  • Email

On September 6, 2012, Petrobras began oil production in the ultra-deep waters of the Chinook oil field from the floating production, storage and offloading platform, FPSO BW Pioneer, moored some 250 kilometers off the coast of the State of Louisiana in the U.S. Gulf of Mexico.

It is the first FPSO to produce oil and gas in the Gulf, with processing capacity of 80,000 barrels of oil and 500,000 cm3 gas per day, and storage facilities for 500,000 barrels of oil. It is moored at a world-record water depth of 2,500 meters.

The Chinook #4 production well was drilled and completed in Lower Tertiary reservoirs (formed between 23 and 65 million years ago), a promising offshore exploration frontier located at a depth of around 8,000 meters. The well is connected to the FPSO by a system incorporating subsea equipment and lines, in addition to free-standing risers (vertical production lines). Oil will be transported to shore on shuttle tankers, and gas through pipelines.

Petrobras is the first company to develop an oilfield in the Gulf of Mexico using these technologies, tried and tested with excellent results in Brazil.

The Cascade and Chinook development projects were deployed in full compliance with Petrobras’ Safety, Environment, Energy Efficiency and Health guidelines, and these standards will be strictly maintained throughout this new production phase.

The production operations now under way in Cascade and Chinook consolidate Petrobras’ position as one of the major players in the ultra-deep waters of the Gulf of Mexico. Production in the Cascade field began in February 2012, and the concession is 100% Petrobras. In the Chinook field, Petrobras has a 66.67% interest, with the remaining 33.33% held by Total Exploration Production USA, Inc.

[mappress] Press Release, September 14, 2012

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Business & FinanceOperations & Maintenance

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Related articles

FPSO Cidade de Itajaí; Source: Altera Infrastructure
Business & Finance

Karoon boosts Brazilian field’s oil output with all wells now online

22 days ago

Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

22 days ago

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

FPSO Cidade de Itajaí; Source: Altera Infrastructure
Business & Finance

Karoon boosts Brazilian field’s oil output with all wells now online

22 days ago
Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

22 days ago