Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo
Topics
  • News
  • Contracts & Tenders
  • Authorities & Government
  • Automation
  • Business & Finance
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Business & Finance›USA: Aker Solutions to Supply Umbilicals for Murphy’s Dalmatian Field
Business & Finance

September 27, 2012 · about 14 years ago

USA: Aker Solutions to Supply Umbilicals for Murphy’s Dalmatian Field

Aker Solutions has been selected to supply two production control umbilicals and three umbilical termination assemblies (UTAs) to Murphy Exploration & Production Company – USA. The products will be delivered to the Murphy operated Dalmatian field in the De Soto Canyon located in the Gulf of Mexico w

2 minutes read
  • LinkedIn
  • X
  • Email

Aker Solutions has been selected to supply two production control umbilicals and three umbilical termination assemblies (UTAs) to Murphy Exploration & Production Company – USA. The products will be delivered to the Murphy operated Dalmatian field in the De Soto Canyon located in the Gulf of Mexico which is jointly owned by Murphy and Ecopetrol America Inc. Contract value is undisclosed.

Aker Solutions has been selected to supply two production control umbilicals and three umbilical termination assemblies (UTAs) to Murphy Exploration & Production Company – USA. The main control and injection umbilical will tie the host facility to Murphy’s De Soto Canyon Block 4 well for a distance of 21 miles (34 km). The second umbilical is an infield umbilical that will connect two blocks 5 miles (8 km) apart. The umbilicals will be used in water depths of approximately 6 000 feet (1 800 metres). Installation is planned for the fourth quarter of 2013.

“Aker Solutions is excited to work with Murphy on this project. We have a strong track-record in the Gulf of Mexico and look forward to executing this contract, ” says Marc Quenneville, head of Aker Solutions’ umbilicals business in North America .

Engineering, project management, and manufacturing of the umbilicals will take place at Aker Solutions’ state-of-the-art umbilicals facility in Mobile, Alabama. Engineering for the subsea UTAs will take place at Aker Solutions’ Houston office while manufacturing will take place in Mobile.

Opened in 2003, Aker Solutions’ umbilical manufacturing facility in Mobile is strategically located to serve the Gulf of Mexico and global markets. The facility, with its high capacity horizontal cabler, is specially designed to meet the challenges of demanding deepwater applications.

Subsea umbilicals are deployed on the seabed to supply necessary controls and chemicals to subsea oil and gas wells, subsea manifolds and any subsea system requiring a remote control.

Over the past 15 years Aker Solutions has delivered more than 400 umbilicals to some of the world’s most challenging fields, from harsh environment to ultra-deep, high-pressure water conditions.

[mappress]

Press Release, September 27, 2012

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Business & FinanceProject & Tenders

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Related articles

FPSO Cidade de Itajaí; Source: Altera Infrastructure
Business & Finance

Karoon boosts Brazilian field’s oil output with all wells now online

19 days ago

Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

19 days ago

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

FPSO Cidade de Itajaí; Source: Altera Infrastructure
Business & Finance

Karoon boosts Brazilian field’s oil output with all wells now online

19 days ago
Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

19 days ago